Laserfiche WebLink
1 <br /> CITY OF EVERETT PUBLIC WORKS SECTION 01 25 00 <br /> SUBSTITUTION PROCEDURES <br /> D. A request constitutes a representation that Bidder or Contractor: <br /> 1. Has investigated proposed product and determined that it meets or exceeds quality level <br /> of specified product. <br /> 2. Will provide same warranty for substitution as for specified product. 111 <br /> 3. Will coordinate installation and make changes to other Work that may be required for the <br /> Work to be complete with no additional cost to City. <br /> 4. Waives claims for additional costs or time extension that may subsequently become <br /> apparent. <br /> 5. Will coordinate installation of the accepted substitute, making such changes as may be <br /> required for the Work to be complete in all respects. <br /> 6. Will reimburse City for review or redesign services associated with reapproval by <br /> authorities having jurisdiction. <br /> E. Substitutions will not be considered when they are indicated or implied on Shop Drawing or <br /> Product Data submittals without separate written request or when acceptance will require <br /> revision to Contract Documents. <br /> F. Substitution Submittal Procedure: <br /> 1. Submit requests for substitutions on CSI Form 13.1A Substitution Request-After the <br /> Bidding/Negotiating Stage. <br /> 2. Submit electronic files to Engineer of Request for Substitution for consideration. Limit <br /> each request to one proposed substitution. <br /> 3. Submit Shop Drawings, Product Data, and certified test results attesting to proposed <br /> product equivalence. Burden of proof is on proposer. <br /> 4. Engineer will notify Contractor in writing of decision to accept or reject request. <br /> 1.4 INSTALLER SUBSTITUTION PROCEDURES <br /> A. Engineer will consider requests for substitutions only within 15 days after date established in <br /> Notice to Proceed. <br /> B. Document each request with: <br /> 1. Installer's qualifications. <br /> 2. Installer's experience in work similar to that specified. <br /> 3. Other information as necessary to assist Engineer's evaluation. <br /> C. Substitution Submittal Procedure: <br /> 1. Submit electronic files to Engineer of Request for Substitution for consideration. Limit I <br /> each request to one proposed substitution. <br /> 2. Engineer will notify Contractor in writing of decision to accept or reject request. <br /> M <br /> PSO6 REROUTE 012500-2 <br /> WO No.—UP3583 MAY 2016 <br /> 1 <br />