Laserfiche WebLink
CITY OF EVERETT PUBLIC WORKS SECTION 01 30 00 <br /> ADMINISTRATIVE REQUIREMENTS <br /> ' SECTION 01 30 00-ADMINISTRATIVE REQUIREMENTS <br /> PART 1 -GENERAL <br /> 1.1 SECTION INCLUDES <br /> A. Coordination and Project conditions. <br /> B. Preconstruction meeting. <br /> C. Site mobilization meeting. <br /> D. Progress meetings. <br /> E. Preinstallation meetings. <br /> F. Closeout meeting. <br /> G. Alteration procedures. <br /> 1.2 COORDINATION AND PROJECT CONDITIONS <br /> A. Coordinate scheduling, submittals, and Work of various Sections of Project Manual to ensure <br /> efficient and orderly sequence of installation of interdependent construction elements. <br /> B. Verify that utility requirements and characteristics of operating equipment are compatible with <br /> building utilities. Coordinate Work of various Sections having interdependent responsibilities <br /> for installing,connecting to,and placing operating equipment in service. <br /> C. Coordinate space requirements, supports, and installation of mechanical Work indicated <br /> diagrammatically on Drawings. Use spaces efficiently to maximize accessibility for <br /> maintenance,and for repairs. <br /> 1. Coordination Drawings: Prepare as required to coordinate all portions of Work. Show <br /> relationship and integration of different construction elements that require coordination <br /> during fabrication or installation to fit in space provided or to function as intended. <br /> Indicate locations where space is limited for installation and access and where sequencing <br /> and coordination of installations are important. <br /> D. Coordination Meetings: In addition to other meetings specified in this Section, hold <br /> coordination meetings with personnel and Subcontractors to ensure coordination of Work. <br /> I <br /> 1.3 PRECONSTRUCTION MEETING <br /> A. City will schedule and preside over meeting after Notice of Award. <br /> PSO6 REROUTE 013000- 1 <br /> WO NO.—UP3583 MAY 2016 <br /> I <br />