Laserfiche WebLink
CITY OF EVERETT PUBLIC WORKS SECTION 01 57 13 <br /> EROSION & SEDIMENTATION CONTROL <br /> I <br /> PART 1 - GENERAL <br /> ' 1.1 SECTION INCLUDES <br /> A. Silt control measures. <br /> B. Grit chamber and dewatering <br /> 1 C. Temporary stormwater runoff and dewatering control. <br /> D. Treatment of silt laden stormwater runoff and groundwater. <br /> ' E. Measures to keep streets clean. <br /> F. Polyethylene sheeting cover for exposed soil. <br /> G. Maintaining and supplementing silt control. <br /> H. Stormwater runoff control measures. <br /> Sawcutting and surfacing pollution prevention measures. <br /> J. Control of silt for overwater construction. <br /> K. Temporary construction entrance. <br /> 1.2 RELATED SECTIONS <br /> A. Section 31 23 35 — Excavating, Backfilling, and Compacting For Utilities and <br /> Structures <br /> ' B. Section 31 51 00 —Tieback Anchors <br /> C. Section 31 62 16 — Steel Piles <br /> D. Section 32 12 16 —Asphalt Paving <br /> E. Section 33 30 00 — Sanitary Sewerage Utilities <br /> 1.3 REFERENCES <br /> A. City of Everett Standards and requirements. <br /> B. WSDOT Standard Specifications -Washington State Department of <br /> Transportation 2016 Standard Specifications for Road, Bridge, and Municipal <br /> Construction. <br /> 1.4 DEFINITIONS <br /> ' A. Grit: Soil particle sizes sand and larger per Unified Soil Classification System, <br /> ASTM D2487 and ASTM D2488. <br /> 1 B. Grit Chamber: A mechanism, usually a structure, designed to remove grit from <br /> water. <br /> PSO6 REROUTE 01 57 13 - 1 <br /> WO NO. — UP3583 MAY 2016 <br /> I <br />