My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 7/25/2016
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 7/25/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 1:45:18 PM
Creation date
7/27/2016 9:27:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
7/25/2016
Council Approval Date
7/6/2016
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Puget Sound Outfall PSO 6 Reroute
Public Works WO Number
UP 3583
Tracking Number
0000178
Total Compensation
$820,344.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 3/1/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
412
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT PUBLIC WORKS SECTION 01 57 13 <br /> EROSION & SEDIMENTATION CONTROL <br /> I <br /> PART 1 - GENERAL <br /> ' 1.1 SECTION INCLUDES <br /> A. Silt control measures. <br /> B. Grit chamber and dewatering <br /> 1 C. Temporary stormwater runoff and dewatering control. <br /> D. Treatment of silt laden stormwater runoff and groundwater. <br /> ' E. Measures to keep streets clean. <br /> F. Polyethylene sheeting cover for exposed soil. <br /> G. Maintaining and supplementing silt control. <br /> H. Stormwater runoff control measures. <br /> Sawcutting and surfacing pollution prevention measures. <br /> J. Control of silt for overwater construction. <br /> K. Temporary construction entrance. <br /> 1.2 RELATED SECTIONS <br /> A. Section 31 23 35 — Excavating, Backfilling, and Compacting For Utilities and <br /> Structures <br /> ' B. Section 31 51 00 —Tieback Anchors <br /> C. Section 31 62 16 — Steel Piles <br /> D. Section 32 12 16 —Asphalt Paving <br /> E. Section 33 30 00 — Sanitary Sewerage Utilities <br /> 1.3 REFERENCES <br /> A. City of Everett Standards and requirements. <br /> B. WSDOT Standard Specifications -Washington State Department of <br /> Transportation 2016 Standard Specifications for Road, Bridge, and Municipal <br /> Construction. <br /> 1.4 DEFINITIONS <br /> ' A. Grit: Soil particle sizes sand and larger per Unified Soil Classification System, <br /> ASTM D2487 and ASTM D2488. <br /> 1 B. Grit Chamber: A mechanism, usually a structure, designed to remove grit from <br /> water. <br /> PSO6 REROUTE 01 57 13 - 1 <br /> WO NO. — UP3583 MAY 2016 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.