McClure and Sons Inc. 7/25/2016
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 7/25/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 1:45:18 PM
Creation date
7/27/2016 9:27:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
7/25/2016
Council Approval Date
7/6/2016
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Puget Sound Outfall PSO 6 Reroute
Public Works WO Number
UP 3583
Tracking Number
0000178
Total Compensation
$820,344.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 3/1/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
412
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS SECTION 01 56 00 <br /> ENVIRONMENTAL CONTROLS <br /> 4. Contractor shall stockpile excavated contaminated soils at a location identified by <br /> the Port on the Port property. Stockpile shall be placed on and covered with plas- <br /> tic sheeting at least 10 mils thick. <br /> 5. Soils that have been classified by the Engineer for disposal shall be disposed of, in <br /> accordance with section 1.8, as directed by the Engineer. The engineer may per- <br /> form additional tests if field screening shows evidence of contamination or if re- <br /> quired by the disposal facility,prior to disposal. I <br /> B.Notification and suspension <br /> 1. In the event the Contractor detects the presence of suspicious materials, the <br /> Contractor shall immediately notify the Engineer. Depending upon the type of <br /> problem identified, the Engineer may suspend the work in the vicinity of the <br /> material discovery under the provisions of section 5.3 of the general conditions. <br /> 2. Following completion of any further testing necessary to determine the nature of <br /> the materials involved, the Engineer will determine how the material shall be han- <br /> dled and disposed of. Although the actual procedures used in resuming the work <br /> shall depend upon the nature and extent of the questionable material,the following <br /> alternate methods of operation are foreseen as possible: <br /> a. Contractor to resume work as before the suspension. <br /> b. Contractor to move its operations to another portion of the work until <br /> measures to eliminate any hazardous conditions can be developed <br /> and approved by the appropriate regulatory agencies. <br /> c. The Engineer to direct the Contractor to dispose of the excavated ma- <br /> terial at an approved legal landfill site or in the case of groundwater <br /> provide adequate treatment prior to discharge/recharge. <br /> d. The Owner to terminate the Contract. <br /> PART 2-PRODUCTS -Not Used <br /> PART 3 -EXECUTION-Not Used <br /> PART 4—PAYMENT <br /> A. The work and materials necessary for providing and maintaining environmental controls in <br /> accordance with this Section, which are not included in other bid items, shall be considered <br /> incidental to the Work. <br /> END OF SECTION 01 56 00 <br /> I <br /> PSO6 REROUTE 015600-6 <br /> WO NO.-UP3853 MAY 2016 <br /> • 1 <br />