Laserfiche WebLink
1 <br /> CITY OF EVERETT PUBLIC WORKS DOCUMENT 00 72 13 1 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS <br /> ARTICLE 3 OWNER I <br /> 3.1 General <br /> A. The Owner, and the Owner's Representative, shall have the authority to act as the sole judge of I <br /> the Work, Equipment and materials with respect to both quantity and quality as set forth in the <br /> Contract. It is expressly stipulated that the Drawings, Specifications and other Contract <br /> Documents set forth the requirements as to the nature of the completed Work and do not purport <br /> to control the method of performing Work except in those instances where the nature of the <br /> completed Work is dependent on the method of performance. <br /> B. The Owner has the authority to act, do, perform, and make any all decisions and actions 111 <br /> authorized by the Contract Documents, including, but not limited to, Change Orders, progress <br /> payments, Contract decisions, acceptability of the Contractor's Work, and early possession. The <br /> Owner has the authority to accept or reject requests for progress payments that have been <br /> submitted by the Contractor and recommended by the Owner's Representative. The Owner has <br /> the authority to make determinations of the acceptability of the Work. The Owner also has the <br /> authority to accept or reject the Owner's Representative's recommendations regarding retention of <br /> defective Work. <br /> 3.2 Owner's Representative <br /> A. The Owner's Representative shall be satisfied that all the Work is being done in accordance with <br /> the requirements of the Contract. The Contract and Specifications give the Owner's <br /> Representative authority over the administration of the Contract. Whenever it is so provided in <br /> this Contract,the decision of the Owner's Representative shall be final. <br /> B. The Owner's Representative's decisions will be final on all questions including but not limited to, <br /> unless specifically assigned to an Architect or Engineer,the following: <br /> 1. Measurement of Work,whether lump sum,Force Account,or unit price; <br /> 2. Acceptability of rates of progress on the Work; <br /> 3. Interpretation of Drawings and Specifications with regard to administrative matters; <br /> 4. Determination as to the existence of changed or differing site conditions; I <br /> 5. Fulfillment of the Contract by the Contractor; <br /> • 6. Payments under the Contract including adjustment and; I <br /> 7. Suspension(s)of Work. <br /> C. If the Contractor fails to respond promptly to the requirements of the Contract or orders from the <br /> Owner's Representative: <br /> 1. The Owner's Representative may use the Owner's resources, other contractors, or other <br /> means to accomplish the Work,and I <br /> 2. The Owner will not be obligated to pay the Contractor, and will deduct from the <br /> Contractor's payments, any costs that result when any other means are used to carry out the <br /> Contract requirements or Owner's Representative's orders. <br /> D. At the Contractor's risk,the Owner's Representative may suspend all or part of the Work if: <br /> PSO6 REROUTE 007213 - 14 1 <br /> WO NO.—UP3583 MAY 2016 <br /> I <br />