Laserfiche WebLink
cover 125% of peak coverage, the Contractor shall be assessed liquidated <br /> damages at a rate of five thousand dollars ($5,000) per day. <br /> 11.4.6 Liquidated Damages for Failure to Properly Equip/Staff Unit: Any <br /> deployed unit failing to meet the minimum required equipment, supplies <br /> and staffing shall be assessed liquidated damages as a missed call at a <br /> rate of $600. Such units must be immediately removed from service until <br /> the deficiency is corrected. <br /> 11.4.7 Liquidated Damages for Failure to Furnish Required Documentation: <br /> In the event Contractor fails to furnish required information, reports, or <br /> documentation, the City shall notify the Contractor of such failure. If the <br /> Contractor does not furnish the information, report, or document within the <br /> time period specified, the City may, at its option, impose liquidated <br /> damages of sixty dollars ($60.00) per day for each item of such information, <br /> report, or document until the requested item is provided. Such liquidated <br /> damages shall not be applied in cases where the cause of such reporting <br /> deficiency was beyond the Contractor's reasonable control. <br /> 11.4.8 Liquidated Damages for Mechanical Failure: If an ambulance <br /> experiences a mechanical failure (breakdown) while transporting a patient <br /> to a hospital, liquidated damages of six hundred Dollars ($600) will be <br /> assessed for each occurrence. <br /> 11.4.9 Liquidated Damages for Failure of Crew to Report: Liquidated <br /> damages of six hundred dollars ($600) will be assessed for failure of the <br /> ambulance crew to report its on-scene arrival to the dispatch center. <br /> 11.4.10 Liquidated Damages for False Report: Liquidated damages of six <br /> hundred dollars ($600) will be assessed for each incident where the City <br /> determines that the crew, dispatchers, or management personnel of the <br /> Contractor reported a false on-scene arrival time. <br /> 11.4.11 Liquidated Damages for Improper Code Transport: Liquidated <br /> damages for not transporting "Non-Code" (without lights and sirens) as <br /> required by subsection 2.2.7 will be assessed at one hundred dollars ($100) <br /> per incident. <br /> 12.0 Liquidated Damages Exemptions <br /> The Contractor may apply and the City may grant exemptions to liquidated damages <br /> resulting from situations beyond the Contractor's control that cause unavoidable delay <br /> or no response. EFD shall examine each request for exemption and shall take into <br /> consideration the Contractor's system status management plan, staffing levels, <br /> dispatch times, in-service times, traffic, street blockages, and other influencing factors. <br /> If EFD determines the circumstances warrant, EFD shall grant an exemption to <br /> liquidated damages resulting from the response time performance standards. To be <br /> 17 of 34 <br />