My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Platinum Nine Holdings LLC dba NW Ambulance 7/19/2016
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Platinum Nine Holdings LLC dba NW Ambulance 7/19/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 2:29:25 PM
Creation date
7/27/2016 10:04:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Platinum Nine Holdings LLC dba NW Ambulance
Approval Date
7/19/2016
Council Approval Date
6/1/2016
Department
Purchasing
Department Project Manager
Clark Langstraat
Subject / Project Title
Ambulance Transport Svcs Basic Life Support
Tracking Number
0000181
Total Compensation
$158,167.04
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Platinum Nine Holdings LLC dba NW Ambulance 4/27/2023 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
exemption request. The Contractor shall submit the final report or request further <br /> review of denied exemptions within 5 business days of receipt of the EFD response. <br /> Failure by the Contractor to meet submission dates will result in automatic waiver of <br /> exemption requests. <br /> 3.7 Quality Improvement Program <br /> The Contractor shall take all steps necessary to eliminate causes of poor response time <br /> performance and upon request shall provide the City with a summary of such corrective <br /> actions. In addition to the Quality Improvement reviews described in Patient Care <br /> Performance (Section 2.3 above), the reporting in Response Time Performance <br /> (Section 3 above) and its program for Quality Improvement for Dispatch <br /> Communications (Section 5.3 below), the Contractor shall develop and maintain a <br /> Quality Improvement Program that includes, at a minimum: <br /> 3.7.1 Review of incident reports with EFD and other governmental agencies to <br /> evaluate Contractor's performance; <br /> 3.7.2 Establishment of a Quality Improvement peer review committee designed <br /> to review documentation and performance of pre-hospital care personnel; <br /> 3.7.3 Observation and evaluation of EMTs in the field, including patient <br /> assessment, diagnosis, protocol selection and compliance, and procedural <br /> competency. <br /> 3.8 Inquiries and Complaints <br /> The Contractor shall provide prompt written responses and follow-up to inquiries <br /> and complaints. Such responses shall be subject to the limitations imposed by <br /> patient confidentiality restrictions. Contractor shall, on a monthly basis, submit <br /> to EFD a list of all complaints received and their respective dispositions. Copies <br /> of such complaints will be made available to the City upon request. Any <br /> complaint received by the City shall be forwarded to the Contractor for action and <br /> the Contractor shall forward the disposition of the complaint to the City within <br /> fifteen business days of receipt. <br /> 4.0 Factors of Production <br /> All equipment, supplies, facilities, locally assigned personnel, and other <br /> production factors utilized by the Contractor in performing the services under the <br /> Contract resulting from this solicitation, whether furnished by the City or not, <br /> shall be devoted to the services under the Contract. <br /> 4.1 Initial Coverage Plan <br /> During the first three (3) months of operations, the Contractor shall adhere to the <br /> initial coverage plans submitted in its proposal or a modification of that plan <br /> which is approved by the City. Thereafter, in the Contractor's discretion, the plan <br /> of coverage may be altered by the Contractor to produce the required response <br /> 6 of 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.