My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Amend 1 Murray Smith & Assoc
>
Contracts
>
6 Years Then Destroy
>
2018
>
Professional Services Amend 1 Murray Smith & Assoc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2016 9:08:25 AM
Creation date
8/1/2016 9:08:17 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Murray Smith & Associates MSA
Approval Date
7/25/2016
Council Approval Date
7/25/2016
End Date
12/31/2018
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Legion Golf Course Stormwater Dentention
Public Works WO Number
UP 3620
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 9—Final Design Services <br /> This task will involve final engineering design services for the Legion Golf Course <br /> Stormwater Detention project. Anticipated elements of this task will include: <br /> 9.1 Golf Course Concept Plan—Develop conceptual plans for the golf course <br /> improvements associated with the project. iConGolf Studio will develop an <br /> understanding of the project, analyze the overall course and develop design strategies <br /> in accordance with Task 1 of their scope of work attached. Key elements of Task 1 <br /> include: <br /> • Up to three design coordination meetings/workshops, including a kickoff <br /> meeting <br /> • Review site conditions and existing information <br /> • Develop alternatives and prepare up to three concept plans <br /> • Review concept plans with team and revise preferred concept plan <br /> 9.2 Golf Course Improvements Schematic Design—The design concept developed in <br /> Subtask 9.1 will be incorporated into the overall project for review. iConGolf will <br /> perform the work in accordance with Task 2 of their scope of work which includes the <br /> following key elements: <br /> • Prepare one final schematic level design plan of the golf course improvements <br /> • Recommend improvements to maintain water quality <br /> • Assist in defining drainage improvements <br /> • Define a strategy to maintain play during construction <br /> • Prepare preliminary construction budget <br /> • Review schematic design with team <br /> 9.3 Prepare 60% Plans,Specifications and Estimate (PS&E)Submittal—MSA will <br /> prepare project plans, specifications and estimate to a 60% level of design completion <br /> based on improvements. Project plans, standard details and specifications will be <br /> prepared in City's format. The following provides a general overview of the proposed <br /> PS&E components that the City will receive and compile into a complete package for <br /> review by the City and MSA: <br /> Plans—Detailed design drawings will be developed for the proposed improvements <br /> and meet City of Everett CAD standards. A preliminary list of drawings that are <br /> anticipated to be included in the final design PS&E are attached. In general, 29 plan <br /> sheets are anticipated and will include the following: <br /> • Detention Ponds—Detention pond plans, cross-sections and details. <br /> • Golf Course Improvements—Golf course plans, clearing and grading plans, <br /> cross-sections and details. <br /> • Storm Drainage—Plan, profile and details for storm drainage improvements <br /> within the Golf Course. <br /> City of Everett MURRAY,SMITH&ASSOCIATES,INC.Legion Golf Course SW Detention <br /> June 2016 Engineers/Planners Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.