Laserfiche WebLink
Subject: Proposed King Noodle Restaurant, 7815 Evergreen Way#A, Everett <br /> August 6, 2012 <br /> Page 2 <br /> type of separation to be used must be approved by the Health District prior to installation and prior to the <br /> request for a preoperational inspection. <br /> 7. The revised floor plan indicates that a 'sink divider typ.' is proposed between the food preparation sink, <br /> Item#2 and three-compartment sink, Item#7. The specific type of divider to be used was not provided. <br /> As noted in the plan letter of June 26, 2012, a horizontal separation of at least 16 inches or a pony <br /> wall,from the floor to at least 16 inches above the sink basin, is required between the food <br /> preparation sink, Item#2 and three-compartment sink, Item #7. Use of splash guards in this <br /> situation is not allowed. The type of separation to be used must be approved by the Health District <br /> prior to installation and prior to the request for a preoperational inspection. <br /> 8. No separation is indicated on the floor plan between the mop sink, Item#1 and the food prep sink, Item <br /> #2. If the mop sink is not a low profile floor mounted sink then a horizontal separation of at least 16 <br /> inches or a pony wall, from the floor to at least 16 inches above the sink basin, is required between the <br /> food preparation sink, Item#2 and the mop sink. Item#1. Use of splash guards in this situation is <br /> not allowed.The type of separation to be used must be approved by the Health District prior to <br /> installation and prior to the request for a preoperational inspection. <br /> 9. Water heaters must be of sufficient size to provide hot water to dishwasher and/or scullery sinks and at <br /> the same time provide hot water to all handwash sinks. <br /> 10. Hot water must be available to all handwash sinks within 15 seconds. The hot water for the facility must <br /> not be used, at any plumbing fixture,for a minimum of 6 hours prior to the preoperational inspection. <br /> This is required so that proper testing of the 15-second time requirement for hot water availability can be <br /> completed. <br /> 11. It cannot be determined from the floor plan or information submitted whether or not a pop dispenser is <br /> proposed to be installed with the ice machine, Item#11. If a pop dispenser is installed a reduced <br /> pressure backflow prevention device is required at the end of the copper water pipe serving the pop <br /> dispensing system prior to the carbonation device. No copper or brass pipe/fittings or other potentially <br /> corrodible material is allowed after the reduced pressure backflow prevention device. If a pop dispenser <br /> is installed the manufacturer name and model number must be submitted prior to the request for a <br /> preoperational inspection. <br /> 12. It cannot be determined from the floor plan or information submitted whether or not a chemical <br /> dispensing system will be installed at the mop sink. Please note that the use of screw-on type Wye' <br /> adaptors at the mop sink faucet for use with chemical dispensing systems is prohibited.Additionally <br /> chemical dispensers cannot be connected to the mop sink faucet. The chemical dispenser must have a <br /> separate water connection. <br /> 13. All food service equipment, both new and used, must be listed by the National Sanitation Foundation <br /> (NSF) or equivalent for its intended use. Used and new refrigeration must be capable of holding food at <br /> temperature of 41°F or below. <br /> 14. Extra wall protection is required on walls behind all sinks, including restroom handwash sinks, and food <br /> preparation counters and tables. A 16-inch high backsplash of plastic laminate, fiberglass-reinforced <br /> plastic or equal is acceptable.A backsplash higher than 16 inches is required on the wall behind counter <br /> top equipment taller than 16 inches. Floor to ceiling protection is required on the wall behind <br /> dishwashers.Wall protection behind mop sinks must cover the entire splash zone. Plastic coated <br /> hardboard is not acceptable. <br /> 15. All floors in the kitchen, food preparation, food service, food storage, and dishwashing areas must be <br /> surfaced with a durable, nonabsorbent, easily cleanable material. Expansion joints, seams, saw cuts and <br /> 7/3 <br />