My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6133 LAKE CHAPLAIN RD 2016-08-08
>
Address Records
>
LAKE CHAPLAIN RD
>
6133
>
6133 LAKE CHAPLAIN RD 2016-08-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2016 11:19:33 AM
Creation date
8/8/2016 11:19:31 AM
Metadata
Fields
Template:
Address Document
Street Name
LAKE CHAPLAIN RD
Street Number
6133
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` 9 • <br /> Replace East Clearwell Control Structure Interior Walkway Water Filtration Plant <br /> EAST CLEARWELL CONTROL STRUCTURE INTERIOR WALKWAY REPLACEMENT UP 3564 <br /> BID RESULTS BUDGET ESTIMATE Date:10-29-2014 EJF <br /> Low Bid Contractor: Ershigs,Inc.;Bellingham,WA <br /> Project Description: <br /> Replace Existing Deficient Walkway Structure and Existing Railing with Aluminum Framing,Safety Speed Rail, <br /> and Access Gate(Optional to COE),Remove and Replace Floor Grating and Alum Panels,Install Water Proof Matting <br /> BID AWARD <br /> Item Description Amount <br /> 1 DEMOLITION OF EXISTING STRUCTURE AND HANDRAILING $7,029.00 <br /> 2 INSTALLATION OF NEW ALUMINUM FRAME SYSTEM $16,990.00 <br /> 3 REMOVE AND REPLACE ALUMINUM GRATING AND PLATES $1,061.00 <br /> 4 WATERPROOFMAT $5,353.00 <br /> 5 SAFETY RAILING-2 RAIL WITH MESH(All sides) $34,063.00 <br /> 7 ACCESS GATE $5,606.00 <br /> CONSTRUCTION COST $70,092.00 Engineer's <br /> Sales Tax 8.3% $5,817.64 Estimate <br /> CONSTRUCTION COST WITH TAX $75,909.64 $95,696 <br />
The URL can be used to link to this page
Your browser does not support the video tag.