My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Aspect Consulting LLC 8/8/2016
>
Contracts
>
6 Years Then Destroy
>
2016
>
Aspect Consulting LLC 8/8/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2016 10:29:58 AM
Creation date
8/12/2016 10:29:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Aspect Consulting LLC
Approval Date
8/8/2016
End Date
12/31/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Three Lakes Bypass
Tracking Number
0000231
Total Compensation
$9,170.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett <br /> July 14, 2016 Project No. 160239 <br /> 3. We will conduct geotechnical engineering analyses with respect to code-based seismic <br /> design parameters, site earthwork, lateral earth pressures for below-grade vaults, foundation <br /> bearing capacities for appurtenant structures,construction dewatering, and structural <br /> backfilling. <br /> 4. We will prepare and submit a draft Geotechnical Report with design and construction <br /> recommendations. We will then address any review comments or questions on the draft and <br /> issue a final Geotechnical report, sealed by the undersigned licensed professional engineer. <br /> Budget <br /> We are prepared to undertake this project on a cost,plus time and materials,basis for a budget not <br /> to exceed $9,170. As requested,this budget includes a$2,000 contingency to cover unanticipated <br /> expenses and/or minor scope changes. A breakdown of our cost estimate is presented in the <br /> attached spreadsheet.A copy of our most recent WSDOT-approved overhead rate calculation <br /> (209.25%), is also attached. <br /> Schedule <br /> We are prepared to begin work on this project within two weeks of notice to proceed(NTP). We <br /> will work with the City of Everett schedule the field work on a day that is convenient to the City. <br /> Our draft report will be submitted within four weeks of completion of the field exploration. Our <br /> final report will be submitted within one week of receipt of review comments and your request for a <br /> final. <br /> Contract Terms and Conditions <br /> We are prepared to contract with the City of Everett using your standard consulting services <br /> agreement. <br /> Closure <br /> We appreciate and thank you for the opportunity to provide this proposal for geotechnical <br /> engineering services. Please contact the undersigned if you have any questions or would like to <br /> discuss this proposal in more detail. <br /> Sincerely, <br /> Aspectconsulting, LLC <br /> Erik O. Andersen, P.E. <br /> Senior Associate Geotechnical Engineer <br /> eandersen(&aspectconsulting.com <br /> 425.772.4705 mobile <br /> Attachments: <br /> Cost Estimate Worksheet(1 page) <br /> Aspect Approved Overhead Calculation(1 page) <br /> Aspect Statement of Qualifications for Utility Projects(1 page) <br /> W:\_GEOTECH\160239 Three Lakes PSV Improvements\Contracts\Proposal Material\Three Lakes Bypass PSV Scope and Budget.docx <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.