My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Aspect Consulting LLC 8/8/2016
>
Contracts
>
6 Years Then Destroy
>
2016
>
Aspect Consulting LLC 8/8/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2016 10:29:58 AM
Creation date
8/12/2016 10:29:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Aspect Consulting LLC
Approval Date
8/8/2016
End Date
12/31/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Three Lakes Bypass
Tracking Number
0000231
Total Compensation
$9,170.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Cost Estimate Aspect Consulting LLC Aspect Proposal No.: 160239 <br /> 3 Lakes Bypass PSV Revision: v2 <br /> City of Everett UP No.3611 Date: 14-Jul-16 <br /> Snohomish County Washington Prepared By: EOA <br /> Proposed Scope of work: <br /> Coodinate and log three to five excavator test pits within the Site area,with an excavator/operator provided by City of Everett. Field classify the samples and prepare logs of the <br /> test pits. Assign laboratory testing as necessary. Perform geotechnical engineering analyses with respect to site earthwork,temporary excavations,construction dewatering, <br /> lateral earth pressures for below-grade vaults,foundation bearing capacities for above-and below-grade structures,and seismic parameters for use with IBC code-based design. <br /> Provide a draft geotechnical engineering report summarizing the results of field investigation and our conclusions and recommendations. Address review comments and issue a <br /> y final geotechnical engineering report stamped by a licensed professional engineer. <br /> ESTIMATED LABOR: <br /> ASPECT STAFF&2016 DIRECT SALARY RATES <br /> Sr.Assoc. Sr.Staff Staff Staff Field Sr.CAD <br /> WORK TASK Principal Engr. Engr. Engineer Tech. Specialist Admin. TOTAL TOTAL <br /> DESCRIPTION $69.67 $56.95 $28.13 $24.08 $20.83 $33.09 $24.08 HOURS AMOUNT <br /> Geotechnical Engineering Support <br /> 1) Site reconnaissance,utility clearances,meet with City 4 4 8 $340 <br /> 2)Coordinate&execute field explorations(test pits) 3 8 11 $396 <br /> 3)Field logs,sample review,assign laboratory testing I 4 5 $169 <br /> 4)Geotechnical engineering analyses 2 6 8 $283 <br /> 5)Draft and final geotechnical engineering report 2 6 3 3 14 $454 <br /> 6)Project and contract management and correspondence 3 1 3 7 $271 <br /> TOTAL DIRECT SALARY LABOR: 0 15 29 0 0 3 6 53 $1,914 <br /> LABORATORY TEST SUMMARY: ESTIMATED DIRECT EXPENSES: <br /> Est.No. Unit Total Mileage and direct expenses $100 <br /> Test Tests COst Cost Miscellaneous expenses(field supplies,ac.) $26 <br /> Natural Moisture Content 4 $18 $72 Geotedudcal Laboratory Testing(ddail to left) $552 <br /> Grain Size Distribution 4 $120 $480 Traffic Control Subcontroaor $0 <br /> Moisture-Density(compaction) 0 $175 $0 Earthwork Subcontractor(test pits) $0 <br /> LABORATORY TOTAL: $552 Private Utility Locate Subcontmaor $0 <br /> TOTAL DIRECT EXPENSES: $678 <br /> LABOR COST SUMMARY: <br /> Dire salary Cost(DSC) $1,914 PROJECT TOTALS AND SUMMARY: <br /> Aspect Ovefiead(OH)rtt 209.25 k(approved by WSDOT) $4,005 Total Labor Cost $6,492 <br /> Profit at 30%of DSC $574 Total Direct Expenses $678 <br /> TOTAL LABOR COST: $6,492 ESTIMATED PROJECT TOTAL: I $7,170 <br /> Contingmry for minor ovnsnns or scope changes $2,000 <br /> ESTIMATED PROJECT TOTAL WITH CONTINGENCY:I 59,170 <br /> Assumptions: <br /> 1. All hours and items are estimated,and may be increased or decreased within the limits of the budget at the discretion of the Aspect project manager.The Aspect project manager <br /> may also transfer funds allocated for direct costs to professional/technical hours,and vice versa,as he determines appropriate. <br /> 2.Site access permissions,permits,and any traffic control approvals will be provided by the City at no cost to Aspect. <br /> 3. The field investigation will consist of four trackhoe test pits. A machine drilled boring is not included. <br /> 4. This work scope excludes evaluation of potential presence or absence of contaminated or hazardous materials in soil or groundwater. <br /> 5. A base map will be provided by the City for use in reporting. <br /> Schedule: <br /> We will complete the field investigation within two weeks of notice to proceed. We will submit our draft report within three weeks of completion of our field investigation. Our final <br /> report will be submitted within one week of receipt of review comments. <br />
The URL can be used to link to this page
Your browser does not support the video tag.