My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Perteet Inc. 8/8/2016
>
Contracts
>
6 Years Then Destroy
>
2017
>
Perteet Inc. 8/8/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2016 11:15:50 AM
Creation date
8/12/2016 11:15:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Perteet Inc.
Approval Date
8/8/2016
Council Approval Date
7/27/2016
End Date
12/31/2017
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Downtown Streetscape Improvements
Tracking Number
0000232
Total Compensation
$674,520.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and amendments to be consistent with the 2016 WSDOT Standard Specifications,and assemble the <br /> Project Manual. The City will provide the latest boilerplate contract. <br /> Opinion of Cost Estimate: A quantity estimate and Engineer's Opinion of Cost Estimate will be prepared <br /> att,the 100%level.This will include updating unit costs. <br /> Assumptions: <br /> • It is assumed that the City will provide the Consultant with one set of written compiled <br /> comments from the City staff. <br /> • It is assumed the City will provide a boiler plate of the Contract section of the Project Manual to <br /> the Consultant. <br /> • It is assumed that walls will not be necessary. If it is determined during the 100%design phase <br /> that walls are necessary,this will be considered as additional work. <br /> • It is assumed that parameters for construction sequencing and order of work will be included in <br /> the specifications and that a construction sequencing plan will not be included in the contract <br /> plans. <br /> Deliverables: <br /> • 7 sets of Y:size Plans,Specifications,and Opinion of Cost. <br /> • Electronic copy of Plans in PDF format. <br /> • Electronic copy of Draft Specifications in Microsoft Word format. <br /> • Electronic copy of Opinion of Cost Estimate in PDF format. <br /> • Written response to City's 90%Comments. <br /> 3.2 Final Bid Documents(PS&E): The Consultant will prepare final contract plans,specifications and <br /> opinion of cost,ad ready documents. <br /> Preparation of Final PS&E: The Consultant will revise the100%Plans,Specifications and Opinion of Cost <br /> Estimate based on City comment and prepare a final,ad ready,PS&E package. This will include the <br /> preparation of the Bid Item List to be included in the Specifications. <br /> Perteet will coordinate with Builders Exchange to provide a hard copy of ad ready documents. <br /> Assumptions: <br /> • It is assumed that the City will provide the Consultant with one set of written compiled comments from <br /> the City staff. <br /> Deliverables: <br /> • 2 sets of'h size Plans,Specifications,and Opinion of Cost. <br /> • 2 sets of full size Plans. <br /> • Electronic copy of Plans in PDF format. <br /> • Electronic copy of Plans in native Autodesk Civil 3D format. <br /> • Electronic copy of Specifications in Microsoft Word format and PDF format. <br /> • Electronic copy of Opinion of Cost in Excel format and PDF format. <br /> • 1 set of ad ready PS&E documents provided to Builders Exchange. <br /> Everett Downtown Screetscape Improvements—Phase 2 Page 4 Scope of Services 6/23/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.