Laserfiche WebLink
,. • s r <br /> System Design <br /> 3-6.1.2.2 Transitional Duct <br /> � <br /> The proposed protection for transitional duct applications should be approved by the AHJ(Authority <br /> Having Jurisdiction) prior to starting this system installation. Badger recommends that transitional <br /> ducts be protected as follows. <br /> Measure the dimensions at s� inches into the transition piece. Determine the number of nozzles <br /> required by the perimeter measured at the six-inch location.Place the tip of the nozzle(s) at s�inches <br /> into the transition piece. See Figure 3-36. <br /> ADP NOZZLE <br /> TRANSITION <br /> SECTION.� <br /> 6 in.(152 mm) <br /> Figure 3-36. Transitional Duct <br /> � �)� �� <br /> � <br /> P/N 60-9127100-000 3-41 April 2009 <br />