My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2675-02
>
Ordinances
>
Ordinance 2675-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2014 3:50:44 PM
Creation date
5/28/2014 3:50:44 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2675-02
Date
12/18/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Cu. Ft. of Water Minimum Charge <br /> Provided at Minimum Minimum W/O Regard to <br /> Meter Size Minimum Charge Water Charge Filtration Charge Consumption <br /> 1/2-3/4 inch 600 $9.69 $1.77 $11.46 <br /> 1 inch 1,000 16.15 2.95 19.10 <br /> 2 inch 1,200 19.38 3.54 22.92 <br /> over 2 inch 1,600 25.84 4.72 30.56 <br /> 5. Untreated Industrial Water <br /> Monthly Water Charge(Kimberly-Clark) $108,500.00 <br /> Other Industrial Supplies: <br /> Meter Charge $1,000.00 monthly <br /> Commodity Charge $255/MG <br /> 6. Fire hydrants and standpipes: The general fund of the City shall pay for hydrant <br /> usage, including transmission and distribution mains, storage facilities and water <br /> used for fire suppression. Charge - $5,000 monthly. <br /> 7. a. City installed service connection charges: <br /> 5/8 x 3/4 inch $800.00 each <br /> 1 inch 1,200.00 <br /> 2 inch 2,000.00 <br /> b. Service connection installations larger than the two-inch size shall be <br /> charged at the actual cost of the complete installation. <br /> c. Said charges include a $60 non-refundable application fee. Service <br /> connection applications shall be valid only for 180 days from date of issue <br /> unless work is in progress or a reasonable time extension is granted by the <br /> Utilities Superintendent. Service connection charges (less said-non- <br /> refundable application fee) may be refunded to the applicant in the event <br /> that refund is requested within one year from the date of issue. <br /> d. Developer installed connection charges: <br /> 5/8 x 3/4 inch $130.00 each <br /> 1 inch 190.00 <br /> 2 inch 530.00 <br /> 8. Penalty charge (for non-payment shut-off/turn on): $25.00 <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.