My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1215 MADRONA AVE 2016-08-24
>
Address Records
>
MADRONA AVE
>
1215
>
1215 MADRONA AVE 2016-08-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2017 8:54:01 PM
Creation date
8/24/2016 9:44:35 AM
Metadata
Fields
Template:
Address Document
Street Name
MADRONA AVE
Street Number
1215
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Retaining Wall Installation Final Letter NGA File No. 924115 <br />Gustafson Residence Retaining Wall February 10, 2016 <br />Everett, Washington Page 2 <br />also observed erosion contro] installation, drainage improvements, and revegetation of the steep slope <br />area below the subject concrete rubble walls. <br />After these improvements were made, we were then retained to evaluate the steep slope area and existing <br />rubble walls, and provide mitigatio» measures to stabilize the top of the steep slope and rubble walls. We <br />prepared a geotechnical report titled "Geotecl�nical E�lgineering Evaluation — Gustafson Residence <br />Retaining Wall — Everett, Washington," dated June 12, 2015. As part of that study, we recommended a <br />pin pile cantilever retaining wall be constructed along the down11i11 side of the concrete rubble walls to <br />stabilize the affected area. We also recommended dr�ai�lage i�nprovements, as well as covel•ing the slope <br />within the vicinity of the new wall with erosion control material and vegetation. We have since <br />monitored the wall installation. <br />Site Observations <br />We monitored wall installation activities on a part-time basis from October 27, 2015 through December <br />30, 2015. Our observations during wall installation at this project were documented in Field Reports 1 <br />through 13, which have been submitted to you. The new wall was located along the lower portion of the <br />existing rubble walls. <br />We observed the installatio�� of l0, 2-inch diameter schedule 80 piles that were driven with a 140-pound <br />air hammer to a total embedment depth in the range of 8.0 feet to 15.4 feet below ground surface along <br />the wall alignme�lt. Al] of the piles were driven to the recommended refusal rate of less than 1-inch oi' <br />movement in 60 seconds of driving. In our opinio��, the pin piles were installed in accordance with our <br />recommendations and the approved plans, and should support the wall. <br />We observed the installation of four helical anchor tieback anchors along the wall alignment. The helical <br />tiebacks consisted oi�triple-flight 8-, 10-, and 12-inch helix anchors with 1-3/4-incl� solid square shafts. <br />The anchors were driven to depths in the range of 23.8 to 27.7 feet from the face of the retaining wall <br />back into the slope. The anchors were driven until the max torque of the drive head used to drive the <br />anchors was reached. This torque was measured at approximately 2,500 to 2,600 PSI at the drive head. <br />The anchors were installed at an approximate angle of 20 degrees below horizo��tal. After ii�stallation, we <br />returned to conduct a load test on one of the helical anchors to verify tlle load carrying capacity. We <br />conducted the test on Anchor H1. The anchor was tested in 50% increments of the design load to a <br />maximum load of 200% of the design load of 7.0 kips. We obse�ved mini�l�al movement of the anchor <br />NELSON GEOTECHNICAL ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.