Laserfiche WebLink
� <br />l <br />2012 Washinqton State Enerav Code Compliance Forms for Commercial, Grou•, and > 3 story R2 and R3 <br />2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Revised June 2013 <br />Proj ect Info Project Address 2300 Merrill Creek Parkway Date g/ 2 6/ 13 <br />Everett WA For Building Department Use <br />AppIICBfIt NBfll@: i,ancPltueller a,rcn�tects <br />� ► �� � --�= ��.-�, <br />Applicant Address: 13o Lakeside, suite 2so, Seattle, wa 9eizz <br />Applicant Phone: zo6-szs-zsss <br />Project Description <br />Lighting Compliance <br />Path <br />Interior Lighting <br />Compliance Option <br />Interior Lighting System <br />Description <br />Briefly describe lighting <br />system type and features. <br />❑ New Building Q Addition � Alteration Q Plans Included <br />� Lighting Power Density Calculations � Total Building Performance <br />(If Total Building Performance then only LGT-CHK is required.) <br />� Buildina Area Methoc 0 Space-by-space Method <br />Additions and Change of Space Use (C101.4.3 & C101.4.4) <br />0 Addition area or Change of Space Use area complies with all applicable provisions as stand alone project <br />� Addition area or Change of Space Use area is combined with existing building lighting systems to demonstra <br />compliance with all applicable provision: <br />Provide Building Area Method (LTG-INT-BLD) or Space-By-Space Method (LTG-INT-SPACE) Compliance Form. Document <br />maximum allowed and proposed (including existing if applicable) lighting wattage of Addition or Change of Use scope. Provide <br />applicable lighting controls per C405.2 and commissioning of lighting controls per C405.13. <br />Alterations, Renovations and Repairs (C101.4.3.1) <br />Q 60% or more of luminaires in space replaced <br />Provide Building Area Method (LTG-INT-BLD) or Space-By-Space Method (LTG-INT-SPACE) Compliance Form. Document <br />maximum allowed and proposed (including existing) lighting wattage of project scope <br />Q Less than 60% of luminaires in space replaced <br />Provide Space-by-space Method (LTG-INT-SPACE) Compliance Form. Document existing total wattage in space and proposed <br />(including existing) lighting wattage of project scope <br />Q Lamp and/or ballast replacement within existing luminaires only — existing total interior building wattage not increased <br />� New wiring installed to serve added fixtures and/or fixtures relocated to new circuit <br />Provide applicable manual lighting controls (C405.2.1 J, occupancy sensors (C405.2.2.2), daylight zone controls (C405.2.2.3), <br />specific application controls (C405.2.3), and commissioning of lighting controls per C405.13 <br />� New or moved lighting panel <br />Provide al! applicable lighting controls as noted for New Wiring, automatic time switch controls (C405.2.2.1), and commissioning of <br />lighting controls per C405.13. <br />Q Space is reconfigured - luminaires unchanged or moved only <br />Provide all applicable lighting controls as noted for New Wiring and commissioning of lighting controls per C405.13. <br />Q No changes are being made to the interior lighting and space use not changed. <br />