My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alpine Waterproofing 8/23/2016
>
Contracts
>
Capital Contract
>
Alpine Waterproofing 8/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 10:34:45 AM
Creation date
8/29/2016 10:26:08 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alpine Waterproofing
Approval Date
8/23/2016
Council Approval Date
7/6/2016
Department
Facilities
Department Project Manager
Scott Pattison
Subject / Project Title
Police Headquarters Masonry Cleaning
Tracking Number
0000250
Total Compensation
$515,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Alpine Waterproofing & Masonry Restoration 11/16/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Alpine Waterproofing & Masonry Restoration 8/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> POLICE HQ—MASONRY CLEANING AND REPAIR APRIL 15,2016 <br /> 1 SECTION O1 2500—SUBSTITUTION PROCEDURES <br /> ' PART 1 —GENERAL <br /> 1.01 GENERAL <br /> ' A. This Section specifies administrative and procedural requirements governing the <br /> Contractor's selection of products for use in the project,and administrative procedures for <br /> handling requests for substitutions made after award of contract. <br /> 1.02 DEFINITIONS <br /> A. Definitions used in this paragraph are not intended to negate the meaning of other terms <br /> used in the contract documents. <br /> ' 1. "Products"are items purchased for incorporation in the work,regardless of <br /> whether they were specifically purchased for the project or taken from the <br /> Contractor's previously purchased stock. <br /> • <br /> 2. "Named Products" are products identified by use of the manufacturer's name for <br /> a product,including such items as a make or model designation,as recorded in <br /> published product literature,of the latest issue as of the date of the contract <br /> documents. <br /> 3. "Materials" are products that must be substantially cut,shaped worked,mixed, <br /> finished,refined or to otherwise fabricated,processed,or installed to form units <br /> of work. <br /> 4. "Equipment" is defined as a product with operational parts,regardless of whether <br /> motorized or manually operated,and in particular, a product that requires service <br /> connections such as wiring or piping. <br /> 5. The terms "equal", "or equal", "or approved equal" and"or approved" are <br /> synonymous. All proposed"equal" products,materials, and equipment must be <br /> approved by the substitution request process. <br /> 1 1.03 QUALITY ASSURANCE <br /> A. SOURCE LIMITATIONS: Provide product of same kind,to fullest extent possible,from <br /> a single source. <br /> B. COMPATIBILITY OF OPTIONS: When Contractor is given the option of selecting <br /> between two or more products for use on the Project,the product selected shall be <br /> compatible with products previously selected,even if previously selected products were <br /> also options. <br /> C. NAME PLATES: Except for required labels and operating data, do not attach or imprint <br /> manufacturer's or producer's nameplates or trademark on surfaces of products which will <br /> be exposed to view in occupied spaces or on the exterior. <br /> 1. LABELS: Locate required product labels and stamps on a concealed surface or, <br /> where required for observation after installation, on an accessible surface that is <br /> not conspicuous. <br /> SUBSTITUTION PROCEDURES 01 2500- 1 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.