My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alpine Waterproofing 8/23/2016
>
Contracts
>
Capital Contract
>
Alpine Waterproofing 8/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 10:34:45 AM
Creation date
8/29/2016 10:26:08 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alpine Waterproofing
Approval Date
8/23/2016
Council Approval Date
7/6/2016
Department
Facilities
Department Project Manager
Scott Pattison
Subject / Project Title
Police Headquarters Masonry Cleaning
Tracking Number
0000250
Total Compensation
$515,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Alpine Waterproofing & Masonry Restoration 11/16/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Alpine Waterproofing & Masonry Restoration 8/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> POLICE HQ—MASONRY CLEANING AND REPAIR APRIL 15,2016 <br /> I <br /> 1.04 SUBMITTALS <br /> A. PRODUCT LISTING SUBMITTAL: Submit three(3)copies of the product-listing <br /> schedule within thirty(30)days after the date of commencement of the work. Provide a <br /> written explanation for omissions of data, and for known variations from contract <br /> requirements. At Contractor's option,initial submittal of the product-listing schedule <br /> may be limited to product selections and product designations that must be established <br /> early in the contract time. Submit completed product-listing schedule within sixty(60) <br /> days after commencement of the work. <br /> 1.05 PRODUCT DELIVERY, STORAGE,AND HANDLING <br /> A. Deliver,store, and handle products in accordance with the manufacturer's <br /> recommendations,using means and method that will prevent damage, deterioration and <br /> loss,including theft. , <br /> B. Schedule delivery to minimize long-term storage at the site and to prevent overcrowding <br /> of construction spaces. <br /> C. Coordinate delivery with installation time to ensure minimum holding time for items that <br /> are flammable,hazardous,easily damaged,or sensitive to deterioration,theft and other <br /> losses. <br /> D. Deliver products to the site in the manufacturer's original sealed container or other <br /> packaging system,complete with labels and instruction for handling, storing,unpacking, <br /> protecting and installing. <br /> E. Inspect products upon delivery to ensure compliance with the contract documents,and to <br /> ensure that products are undamaged and properly protected. <br /> F. Store products at the site in a manner that will facilitate inspection and measurement of <br /> quantity or counting of units. <br /> G. Store heavy materials away from the project structure in a manner that will not endanger <br /> the supporting construction. I <br /> H. Store products subject to damage by the elements above ground,under cover in a <br /> weather-tight enclosure,with ventilation adequate to prevent condensation. Maintain <br /> temperature and humidity within range required by manufacturer's instructions. <br /> I. OFF-SITE STORAGE: If requested by the Contractor and approved in writing by the <br /> Owner,the Owner may make payment to the Contractor for products stored off-site. <br /> J. OWNER-FURNISHED MATERIALS: When materials or equipment furnished by the <br /> Owner for installation by the Contractor are to be delivered and stored prior to <br /> 111 <br /> installation,the Contractor shall provide suitable,secure storage and protect from <br /> damage, theft or other loss until installation. <br /> I <br /> SUBSTITUTION PROCEDURES 01 2500-2 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.