My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alpine Waterproofing 8/23/2016
>
Contracts
>
Capital Contract
>
Alpine Waterproofing 8/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 10:34:45 AM
Creation date
8/29/2016 10:26:08 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alpine Waterproofing
Approval Date
8/23/2016
Council Approval Date
7/6/2016
Department
Facilities
Department Project Manager
Scott Pattison
Subject / Project Title
Police Headquarters Masonry Cleaning
Tracking Number
0000250
Total Compensation
$515,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Alpine Waterproofing & Masonry Restoration 11/16/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Alpine Waterproofing & Masonry Restoration 8/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> POLICE HQ—MASONRY CLEANING AND REPAIR APRIL 15, 2016 <br /> 7. VISUAL SELECTION: Where specified product requirements include the <br /> phrase "...as selected from the manufacturer's standard colors,patterns, <br /> textures..."or similar phrases,select a product and manufacturer that complies <br /> with other specified requirements. Architect will select the color,patterns and <br /> texture from the product line selected. <br /> 1.07 SUBSTITUTIONS <br /> A. GENERAL: If the Contractor desires approval of some material or product other than <br /> that specified,he may submit a written request for approval of the substitute item in <br /> accordance with the following requirements. <br /> 1. All such requests shall be submitted in four(4)copies,and must be made on the <br /> "Substitution Request Form",see Section 006325 Substitution Request Form. <br /> 2. No request for approval will be considered unless submitted in accordance with <br /> this Section. <br /> 3. Final decision as to whether an item is an equal or satisfactory substitution rests <br /> with the Owner. <br /> B. REQUESTS FOR APPROVAL: Every request for approval must state whether the item r <br /> offered is an equal or better substitution. Each request for substitution must be <br /> referenced to the related specification section and drawing numbers,and be complete <br /> with product data/drawings,description of methods,technical and other information. If <br /> applicable, include samples showing comparison or physical and other pertinent <br /> characteristics as required to establish equivalence of acceptability for the proposed <br /> application. Where specific a test results are required by the contract documents,the <br /> comparison data for the proposed item shall be based upon the same test methods as <br /> those specified, or they shall be correlated to clearly demonstrate comparability. The <br /> same warranty described for the specified product is required for the substitution. <br /> C. DURING BID PERIOD: Request for substitutions will not be considered during the bid <br /> period. <br /> D. AFTER RECEIPT OF BID: Requests for approval of alternative materials or products <br /> will be considered by the Owner for a period of sixty(60)calendar days following date of <br /> "Notice To Proceed". Within ten(10)calendar days of receipt of Contractor's request for <br /> substitution,the Owner will request whatever additional information or documentation <br /> may be needed for his evaluation of the request. Within twenty(20) calendar days of <br /> receipt of request,or within one week of receipt of requested additional information or <br /> documentation(whichever is later), the Owner will notify the Contractor of either his <br /> acceptance or his rejection of the proposed substitution. In submitting a request for <br /> substitution,the Contractor agrees to the following: <br /> 1. That he has personally investigated the proposed substitute product or material <br /> and determined that it is equal or superior in all respects to that specified. <br /> 2. That he shall provide the same warranty for the substitution as he would for that <br /> specified. <br /> 3. That he will coordinate all trades,including changes thereto as may be required, <br /> that he waives all claims for additional costs which subsequently become <br /> apparent as a consequence of the substitution and that he will bear all costs <br /> related thereto. <br /> SUBSTITUTION PROCEDURES 01 2500-4 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.