Laserfiche WebLink
I <br /> POLICE HQ—MASONRY CLEANING AND REPAIR APRIL 15, 2016 <br /> G. Substitutions will not be considered if they are indicated or implied on shop drawings or <br /> other project data submittals,without proper notice shown on Section 00 63 25. <br /> H. WORK-RELATED SUBMITTALS: Contractor's submittal of, and Architect's <br /> acceptance of,shop drawings,product data or samples which indicate work not <br /> complying with requirements of contract documents,does not constitute an acceptable <br /> and valid request for,nor approval of,a substitution. <br /> PART 2—PRODUCTS I <br /> NOT USED <br /> PART 3—EXECUTION I <br /> NOT USED <br /> END OF SECTION <br /> I <br /> 1 <br /> M <br /> 1 <br /> I <br /> 1 <br /> I, <br /> I <br /> 1 <br /> 1 <br /> SUBSTITUTION PROCEDURES 01 2500-6 <br /> I <br />