My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alpine Waterproofing 8/23/2016
>
Contracts
>
Capital Contract
>
Alpine Waterproofing 8/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 10:34:45 AM
Creation date
8/29/2016 10:26:08 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alpine Waterproofing
Approval Date
8/23/2016
Council Approval Date
7/6/2016
Department
Facilities
Department Project Manager
Scott Pattison
Subject / Project Title
Police Headquarters Masonry Cleaning
Tracking Number
0000250
Total Compensation
$515,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Alpine Waterproofing & Masonry Restoration 11/16/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Alpine Waterproofing & Masonry Restoration 8/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POLICE HQ—MASONRY CLEANING AND REPAIR APRIL 15,2016 <br /> 1.06 HEALTH AND SAFETY REPRESENTATIVE <br /> ' A. The Contractor shall designate a Health and Safety Representative who will oversee all <br /> work taken place on the job site including work performed by subcontractors and <br /> suppliers. The Health and Safety Rep should be capable of identifying hazards within the <br /> job site,take immediate actions to correct hazard and if needed, stop work until hazards <br /> have been corrected. <br /> B. The Contractor shall authorize the Health and Safety Representative to resolve safety- <br /> !' <br /> issues raised by the Owner. <br /> C. The Health and Safety Representative is responsible to insure that work is performed in <br /> accordance with the Health and Safety Plan. <br /> D. At the daily job briefing and/or tailgate conference,Contractor shall provide the Owner's <br /> representative in attendance at the meeting all relevant information on the Work to be <br /> performed, its location,and the equipment to be used. <br /> E. The Contractor is responsible to insure that its workers and subcontractors have all safety <br /> equipment required for the Work. <br /> F. Nothing in this Contract shall be construed as imposing any duty upon the Owner or any <br /> of its employees with regard to,or as constituting any express or implied assumption of <br /> control or responsibility over,Project Site safety,or over any other safety conditions <br /> relating to employees or agents of Contractor or any of its Subcontractors,or the public. <br /> PART 2—PRODUCTS <br /> NOT USED <br /> PART 3—EXECUTION <br /> NOT USED <br /> END OF SECTION <br /> I <br /> I <br /> I <br /> HEALTH AND SAFETY 01 3529-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.