My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alpine Waterproofing 8/23/2016
>
Contracts
>
Capital Contract
>
Alpine Waterproofing 8/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 10:34:45 AM
Creation date
8/29/2016 10:26:08 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alpine Waterproofing
Approval Date
8/23/2016
Council Approval Date
7/6/2016
Department
Facilities
Department Project Manager
Scott Pattison
Subject / Project Title
Police Headquarters Masonry Cleaning
Tracking Number
0000250
Total Compensation
$515,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Alpine Waterproofing & Masonry Restoration 11/16/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Alpine Waterproofing & Masonry Restoration 8/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> POLICE HQ—MASONRY CLEANING AND REPAIR APRIL 15,2016 <br /> I <br /> 1.05 PLAN <br /> A. The Contractor shall develop a Site Specific Health and Safety Plan addressing health <br /> and safety management methods specific to the project. The Plan shall,at a minimum, <br /> include: I <br /> 1. The name of the individual at the jobsite responsible for implementation and <br /> compliance with this Plan. <br /> 2. If work requires the use of Fall Restraint or Fall Arrest,a Fall Protection work <br /> plan meeting the requirements set forth in WAC 296-155-24505 shall be <br /> included. <br /> 3. If applicable,the Plan shall include the name and qualifications of any electrical ' <br /> safety observer to be provided by the Contractor. <br /> 4. Steps taken to provide Protection of the Public and City Employees. This <br /> includes protection from falling objects. Indicated type of overhead safe guards <br /> and protection to be installed and safeguards from equipment damage due to <br /> debris(including nails)on the ground. <br /> 5. A description of tasks to be undertaken,and equipment mobilized for this project. <br /> 6. A list of all known and expected safety or health hazards,problems,and <br /> proposed control mechanisms. <br /> 7. Material Safety Data Sheets(MSDS)of and procedures for using,disposing of, <br /> or storing for all chemicals,products,or materials regulated by WAC 296-62 to <br /> be used by the Contractor. <br /> 8. A list of personal protective equipment,monitoring devices,and hazard-specific <br /> plans or permits as appropriate and required by State and Federal regulations. <br /> 9. A description of emergency response measures, equipment available for <br /> emergency response to address accidents and releases of materials, including,but <br /> not limited to, first aid,eye wash/showers,and fire extinguishing equipment,and <br /> location of this equipment at the jobsite. <br /> 10. Emergency phone numbers contacts, and location of the nearest medical facility. <br /> 11. A monitoring and inspection plan and record keeping measures to ensure that <br /> equipment and work practices comply with this Plan. <br /> 12. Personnel names,training and notification procedures as appropriate to ensure <br /> that all jobsite personnel are familiar with the Plan elements. Include copies of <br /> training certificates. <br /> 13. Procedures for safe storage and handling of flammable liquids,in accordance <br /> with WAC 296-24-330. <br /> 14. If applicable the Contractor shall include procedures for safe storage and <br /> handling of compressed gasses in accordance with WAC 296-24-295, <br /> Compressed Gas General Requirement. <br /> 15. Other issues which the Contractor determines are appropriate and necessary to <br /> protect worker safety and health. <br /> 16. This plan shall be posted and marked in a location on site that will be noticed <br /> upon entry of work site. A fall protection plan must also be established and shall <br /> be posted next to the Health and Safety Plan(Accident Prevention Program). <br /> These postings are required to be protected from inclement weather and must be <br /> legible during the extent of this contract. 1 <br /> HEALTH AND SAFETY 01 3529-2 111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.