My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alpine Waterproofing 8/23/2016
>
Contracts
>
Capital Contract
>
Alpine Waterproofing 8/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 10:34:45 AM
Creation date
8/29/2016 10:26:08 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alpine Waterproofing
Approval Date
8/23/2016
Council Approval Date
7/6/2016
Department
Facilities
Department Project Manager
Scott Pattison
Subject / Project Title
Police Headquarters Masonry Cleaning
Tracking Number
0000250
Total Compensation
$515,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Alpine Waterproofing & Masonry Restoration 11/16/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Alpine Waterproofing & Masonry Restoration 8/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POLICE HQ—MASONRY CLEANING AND REPAIR APRIL 15,2016 <br /> SECTION 01 4500—QUALITY CONTROL <br /> ' PART 1 —GENERAL <br /> 1.01 SUMMARY <br /> A. This Section includes administrative and procedural requirements for quality assurance <br /> and quality control. <br /> B. Testing and inspecting services are required to verify compliance with requirements <br /> specified or indicated. These services do not relieve Contractor of responsibility for <br /> compliance with the Contract Document requirements. <br /> 1. Specified tests,inspections,and related actions do not limit Contractor's quality- <br /> control procedures that facilitate compliance with the Contract Document <br /> ' requirements. <br /> 2. Requirements for Contractor to provide quality-control services required by <br /> Engineer, City,or authorities having jurisdiction are not limited by provisions of <br /> ' this Section. <br /> C. Contractor will pay for all proctor tests for all materials used for fill. <br /> 1 D. Owner will employ and pay for the services of an independent testing laboratory to <br /> perform specified laboratory testing of materials: <br /> 1. In-place soil,gravels and import fill density testing. <br /> 2. In-place asphalt density testing. <br /> 3. Concrete slump,air content,and compression testing,excluding initial mix <br /> ' designs. <br /> 4. In place masonry grout. <br /> 5. Anchor bolts and structural anchors. <br /> 1 1.02 DEFINITIONS <br /> A. Quality-Assurance Services: Activities,actions,and procedures performed before and <br /> ' during execution of the Work to guard against defects and deficiencies and ensure that <br /> proposed construction complies with requirements. <br /> ' B. Quality-Control Services: Tests,inspections,procedures, and related actions during and <br /> after execution of the Work to evaluate that completed construction complies with <br /> requirements. Services do not include contract enforcement activities performed by <br /> Engineer. <br /> C. Testing Agency: An entity engaged to perform specific tests,inspections, or both. <br /> Testing laboratory shall mean the same as testing agency. <br /> 1.03 DELEGATED DESIGN <br /> I <br /> QUALITY CONTROL 00 4500- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.