Laserfiche WebLink
i <br /> POLICE HQ—MASONRY CLEANING AND REPAIR APRIL 15,2016 <br /> A. Performance and Design Criteria: Where professional design services or certifications by <br /> a design professional are specifically required of Contractor by the Contract Documents, <br /> provide products and systems complying with specific performance and design criteria <br /> indicated. <br /> 1. If criteria indicated are not sufficient to perform services or certification required, <br /> submit a written request for additional information to Engineer. <br /> 1.04 SUBMITTALS I <br /> A. Qualification Data: For testing agencies specified in"1.05 Quality Assurance"Article to <br /> demonstrate their capabilities and experience. Include proof of qualifications in the form <br /> of a recent report on the inspection of the testing agency by a recognized authority. <br /> B. Delegated-Design Submittal: In addition to Shop Drawings, Product Data, and other <br /> required submittals, submit a statement,signed and sealed by the responsible design <br /> professional, for each product and system specifically assigned to Contractor to be <br /> designed or certified by a design professional,indicating that the products and systems <br /> are in compliance with performance and design criteria indicated. Include list of codes, <br /> loads, and other factors used in performing these services. <br /> C. Reports: Prepare and submit certified written reports that include the following: <br /> 1. Date of issue. <br /> 2. Project title and number. <br /> 3. Name,address,and telephone number of testing agency. <br /> 4. Dates and locations of samples and tests or inspections. <br /> 5. Names of individuals making tests and inspections. <br /> 6. Description of the Work and test and inspection method. ' <br /> 7. Identification of product and Specification Section. <br /> 8. Complete test or inspection data. <br /> 9. Test and inspection results and an interpretation of test results. <br /> 10. Ambient conditions at time of sample taking and testing and inspecting. <br /> 11. Comments or professional opinion on whether tested or inspected Work complies <br /> with the Contract Document requirements. <br /> 12. Name and signature of laboratory inspector. <br /> 13. Recommendations on retesting and reinspecting. <br /> D. Permits,Licenses,and Certificates: For City's records, submit copies of permits, ' <br /> licenses,certifications,inspection reports,releases,jurisdictional settlements,notices, <br /> receipts for fee payments,judgments,correspondence,records,and similar documents, <br /> established for compliance with standards and regulations bearing on performance of the <br /> Work. <br /> 1.05 QUALITY ASSURANCE <br /> A. Fabricator Qualifications: A firm experienced in producing products similar to those <br /> indicated for this Project and with a record of successful in-service performance,as well <br /> as sufficient production capacity to produce required units. <br /> QUALITY CONTROL 00 4500-2 111 <br /> 1 <br />