My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alpine Waterproofing 8/23/2016
>
Contracts
>
Capital Contract
>
Alpine Waterproofing 8/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 10:34:45 AM
Creation date
8/29/2016 10:26:08 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alpine Waterproofing
Approval Date
8/23/2016
Council Approval Date
7/6/2016
Department
Facilities
Department Project Manager
Scott Pattison
Subject / Project Title
Police Headquarters Masonry Cleaning
Tracking Number
0000250
Total Compensation
$515,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Alpine Waterproofing & Masonry Restoration 11/16/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Alpine Waterproofing & Masonry Restoration 8/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POLICE HQ—MASONRY CLEANING AND REPAIR APRIL 15,2016 <br /> 1. Where services are indicated as Contractor's responsibility,engage a qualified <br /> testing agency to perform these quality-control services. <br /> a. Contractor shall not employ the same entity engaged by City,unless <br /> agreed to in writing by City. <br /> 2. Notify testing agencies at least 24 hours in advance of time when Work that <br /> requires testing or inspecting will be performed. <br /> 3. Where quality-control services are indicated as Contractor's responsibility, <br /> submit a certified written report,in duplicate,of each quality-control service. <br /> 4. Testing and inspecting requested by Contractor and not required by the Contract <br /> Documents are Contractor's responsibility. <br /> 5. Submit additional copies of each written report directly to authorities having <br /> jurisdiction,when they so direct. <br /> C. Special Tests and Inspections: City will engage a testing agency to conduct special tests <br /> and inspections required by authorities having jurisdiction as the responsibility of City. <br /> 1. Testing agency will notify Engineer and Contractor promptly of irregularities and <br /> deficiencies observed in the Work during performance of its services. <br /> 2. Testing agency will submit a certified written report of each test,inspection,and <br /> similar quality-control service to Engineer with copy to Contractor and to <br /> authorities having jurisdiction. <br /> 3. Testing agency will submit a final report of special tests and inspections at <br /> Substantial Completion, which includes a list of unresolved deficiencies. <br /> 4. Testing agency will interpret tests and inspections and state in each report <br /> whether tested and inspected work complies with or deviates from the Contract <br /> Documents. <br /> 5. Testing agency will retest and reinspect corrected work. <br /> D. Manufacturer's Field Services: Where indicated,engage a factory-authorized service <br /> representative to inspect field-assembled components and equipment installation, <br /> including service connections. Report results in writing. <br /> E. Retesting/Reinspecting: Regardless of whether original tests or inspections were ' <br /> Contractor's responsibility,provide quality-control services, including retesting and <br /> reinspecting,for construction that revised or replaced Work that failed to comply with <br /> requirements established by the Contract Documents. ' <br /> F. Testing Agency Responsibilities: Cooperate with Engineer and Contractor in <br /> performance of duties. Provide qualified personnel to perform required tests and <br /> inspections. <br /> 1. Notify Engineer and Contractor promptly of irregularities or deficiencies <br /> observed in the Work during performance of its services. <br /> 2. Interpret tests and inspections and state in each report whether tested and <br /> inspected work complies with or deviates from requirements. <br /> 3. Submit a certified written report, in duplicate,of each test,inspection,and similar <br /> quality-control service through Contractor. <br /> 4. Do not release,revoke, alter, or increase requirements of the Contract Documents <br /> or approve or accept any portion of the Work. <br /> 5. Do not perform any duties of Contractor. <br /> QUALITY CONTROL 00 4500 -4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.