My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alpine Waterproofing 8/23/2016
>
Contracts
>
Capital Contract
>
Alpine Waterproofing 8/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 10:34:45 AM
Creation date
8/29/2016 10:26:08 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alpine Waterproofing
Approval Date
8/23/2016
Council Approval Date
7/6/2016
Department
Facilities
Department Project Manager
Scott Pattison
Subject / Project Title
Police Headquarters Masonry Cleaning
Tracking Number
0000250
Total Compensation
$515,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Alpine Waterproofing & Masonry Restoration 11/16/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Alpine Waterproofing & Masonry Restoration 8/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POLICE HQ—MASONRY CLEANING AND REPAIR APRIL 15,2016 <br /> G. Associated Services: Cooperate with agencies performing required tests, inspections, and <br /> similar quality-control services,and provide reasonable auxiliary services as requested. <br /> ' Notify agency sufficiently in advance of operations to permit assignment of personnel. <br /> Provide the following: <br /> ' 1. <br /> 2. Access to the Work. <br /> Incidental labor and facilities necessary to facilitate tests and inspections. <br /> 3. Adequate quantities of representative samples of materials that require testing <br /> ' and inspecting. Assist agency in obtaining samples. <br /> 4. Facilities for storage and field-curing of test samples. <br /> 5. Delivery of samples to testing agencies. <br /> 6. Preliminary design mix proposed for use for material mixes that require control <br /> ' by testing agency. <br /> 7. Security and protection for samples and for testing and inspecting equipment at <br /> Project site. <br /> ' H. Coordination: Coordinate sequence of activities to accommodate required quality- <br /> assurance and quality-control services with a minimum of delay and to avoid necessity of <br /> removing and replacing construction to accommodate testing and inspecting. <br /> 1. Schedule times for tests,inspections,obtaining samples, and similar activities. <br /> PART 2-PRODUCTS <br /> ' NOT USED <br /> ' PART 3—EXECUTION <br /> 3.01 REPAIR AND PROTECTION <br /> ' A. General: On completion of testing,inspecting, sample taking,and similar services,repair <br /> damaged construction and restore substrates and finishes. <br /> 1. Provide materials and comply with installation requirements specified in other <br /> Sections of these Specifications. Restore patched areas and extend restoration <br /> into adjoining areas in a manner that eliminates evidence of patching. <br /> ' B. Protect construction exposed by or for quality-control service activities. <br /> C. Repair and protection are Contractor's responsibility,regardless of the assignment of <br /> responsibility for quality-control services. <br /> END OF SECTION <br /> QUALITY CONTROL 00 4500- 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.