My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alpine Waterproofing 8/23/2016
>
Contracts
>
Capital Contract
>
Alpine Waterproofing 8/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 10:34:45 AM
Creation date
8/29/2016 10:26:08 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alpine Waterproofing
Approval Date
8/23/2016
Council Approval Date
7/6/2016
Department
Facilities
Department Project Manager
Scott Pattison
Subject / Project Title
Police Headquarters Masonry Cleaning
Tracking Number
0000250
Total Compensation
$515,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Alpine Waterproofing & Masonry Restoration 11/16/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Alpine Waterproofing & Masonry Restoration 8/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POLICE HQ—MASONRY CLEANING AND REPAIR APRIL 15, 2016 <br /> requesting on Street parking to be prohibited adjacent to the work <br /> area <br /> 3) Maintain traffic on a paved surface whenever possible. In the event <br /> that a graveled or dirt surface must be used as a detour, maintain a <br /> smooth surface and control dust <br /> 4) Clean up spillage from trucks on the pedestrian or driving surface <br /> adjacent to the work area. <br /> 5) Provide safe and protected pedestrian ways. <br /> 6) Not park or place construction Equipment to create an unnecessary <br /> sight distance or other safety obstruction to vehicular or pedestrian <br /> traffic. <br /> 7) Maintain work area traffic control devices in a proper condition on <br /> an"around the clock"basis whether or not work is actively being 1 <br /> pursued. In addition,the Contractor shall assure that tools and <br /> Equipment are properly stored and excavation bridging is secure <br /> and adequately covering excavation. <br /> d. Erect and maintain all construction signs,warning signs,detour signs, <br /> and other traffic control devices necessary to warn and protect the public <br /> at all times from injury or damage resulting from the Contractor's <br /> operations. <br /> e. Be liable for injuries and damages to persons and property suffered by <br /> reason of the Contractor's operations or any negligence in connection <br /> therewith. <br /> f. Construct,maintain in a safe condition,keep open to traffic,and remove <br /> when no longer needed detours and temporary approaches that will <br /> accommodate traffic diverted from the Roadway, walkway or bridge <br /> during construction. On-site or off-site detours required or necessitated <br /> by the Work, including side Street crossings,temporary bridges, <br /> utilization of one or more lanes of the construction area for maintenance <br /> of through traffic, and related traffic control shall be the responsibility of <br /> the Contractor. <br /> B. Traffic Control Management I <br /> 1. General: <br /> a. All Projects in Street areas will be inspected with regard to type and I <br /> placement of pedestrian and vehicular traffic control devices. Traffic <br /> control devices not meeting the requirements of the MUTCD Manual <br /> shall be considered non-standard. Non-standard traffic control devices <br /> shall not be used unless specifically approved for use, in writing,by the <br /> Owner. <br /> b. The Contractor shall patrol the traffic control area as often as necessary, <br /> but at least daily,and reset all disturbed signs and traffic control devices. <br /> Signs and other traffic control devices shall be removed or covered <br /> during periods when they are not necessary. <br /> c. Before beginning Work,the Contractor shall designate an individual or <br /> individuals to perform the duties of Traffic Control Manager(TCM). <br /> These individuals shall be in continuous responsible charge of traffic <br /> control. A TCM is required on all Projects that require traffic control. <br /> 2. Traffic Control Manager(TCM)-The duties of the TCM shall include: <br /> VEHICULAR ACCESS AND PARKING 01 5500-6 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.