Laserfiche WebLink
I <br /> POLICE HQ—MASONRY CLEANING AND REPAIR APRIL 15,2016 <br /> a. Discussing proposed traffic control measures and coordinating <br /> implementation of the Contractor adopted traffic control plan(s)with the <br /> ' <br /> b. Owner <br /> Coordinating all traffic control operations, including those of <br /> Subcontractors, Suppliers,and any adjacent construction or maintenance <br /> I <br /> c. operations <br /> Coordinating the Project's activities(Road closures,and lane closures) <br /> with appropriate police, fire control agencies,city or county engineering, <br /> medical emergency agencies, school districts,disposal companies,and <br /> transit companies <br /> d. Overseeing all requirements of the Contract that contribute to the <br /> convenience, safety,and orderly movement of vehicular and pedestrian <br /> I traffic <br /> e. Having the latest adopted edition of the MUTCD Manuel and applicable <br /> standards and Contract available at all times on the Project <br /> I f. Attending all Project meetings where traffic management is discussed <br /> 3. Contractor's Refusal or Failure to Act: <br /> a. Upon failure or refusal of the Contractor to comply with the Owner's <br /> Written Notice to: <br /> 1) Provide adequate flaggers, <br /> 2) Provide, erect,maintain,and remove,as applicable,barricades, <br /> signs, lights, on-site or off-site detours or detour bridges,or <br /> 3) Provide any work required by Article 1.02 and Article 1.03 of this <br /> section. <br /> 4) Follow the Engineer's order to do 1), 2),or 3),the Engineer shall <br /> have the option to do one or any combination of the following: <br /> a) Suspend the Work without further notice to the Contractor or <br /> the Contractor's Surety until the Contractor complies with the <br /> Owner's order <br /> b) Immediately provide an off-duty uniformed police officer at no <br /> additional cost to the Owner,or <br /> c) Provide, erect,maintain and remove barricades,signs and <br /> lights at no additional cost to the Owner,by Owner's forces or <br /> by others,and <br /> d) Deduct all costs related to items 1), 2),or 3) from any progress <br /> I payments due or coming due the Contractor. <br /> b. The above options shall not bar the Owner from exercising other <br /> remedies because of the Contractor's failure or refusal to comply with a <br /> I contractual obligation. <br /> 4. Traffic Control Plans: <br /> a. Content and Submittal Requirements <br /> 1) Based on the Contractor's intended method of performing the Work, <br /> the Contractor shall develop,adopt,and submit to the Owner a <br /> specific traffic control plan or plans for protecting and controlling <br /> pedestrian and vehicle traffic during construction operations. A <br /> separate Traffic Control Plan is required for each work location <br /> within the Street Right of Way. Typical plans may be submitted for <br /> areas with identical traffic requirements. Typical plans shall be <br /> clearly labeled to indicate all locations the plan is to represent. <br /> Traffic control plans shall take into consideration any Street and <br /> VEHICULAR ACCESS AND PARKING 01 5500-7 <br /> I <br />