My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alpine Waterproofing 8/23/2016
>
Contracts
>
Capital Contract
>
Alpine Waterproofing 8/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 10:34:45 AM
Creation date
8/29/2016 10:26:08 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alpine Waterproofing
Approval Date
8/23/2016
Council Approval Date
7/6/2016
Department
Facilities
Department Project Manager
Scott Pattison
Subject / Project Title
Police Headquarters Masonry Cleaning
Tracking Number
0000250
Total Compensation
$515,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Alpine Waterproofing & Masonry Restoration 11/16/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Alpine Waterproofing & Masonry Restoration 8/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POLICE HQ—MASONRY CLEANING AND REPAIR APRIL 15,2016 <br /> lane closure or other restrictions that may be specified in the 111 <br /> Contract. <br /> 2) Submittal shall be made at least 15 Working Days before planned <br /> implementation. The Contractor shall not begin Work in the Street <br /> Right of Way until an approved Traffic Control Plan for the specific <br /> location has been returned by the Owner. Submittal shall be in <br /> accordance with Section 013300,except no more than two <br /> reproductions will be required for any Plan size. <br /> 3) Traffic Control Plans shall indicate: <br /> a) Vehicular and pedestrian traffic routing <br /> b) Proposed location of flaggers,barricades, lighting, signing, and <br /> other traffic control devices in relation to existing Roadway <br /> edges and lane markings I <br /> c) Proposed number of working hours <br /> d) Arrangements for access to buildings within and immediately <br /> adjacent to construction site <br /> e) Arrangements for emergency exiting from buildings within <br /> and immediately adjacent to the Project Site <br /> f) Anticipated driveway blockage resulting from construction <br /> operations <br /> g) Restrictions to on-Street parking within immediate vicinity of <br /> site, including arrangements for hooding parking meters as <br /> necessary <br /> h) Arrangements for temporary passenger and commercial <br /> loading and unloading zones, and temporary bus stop zones <br /> i) Routing of construction trucks <br /> j) Coordination in sequencing traffic control with scheduling of <br /> Work and work locations. <br /> 4) The Contractor shall plan and schedule Contractor work activities to <br /> conform to and allow time for notifications,reviews,approvals, <br /> acceptances,and other conditions of the Contract. <br /> b. Conformance to Established Standards: <br /> 1) The condition of signs and traffic control devices shall be new or <br /> "acceptable"as defined in the book Quality Standards for Work <br /> Zone Traffic Control Devices, and will be accepted based on a <br /> visual inspection by the Owner. The Owner's decision on the <br /> condition of a sign or traffic control device shall be final. When a <br /> sign or traffic control device becomes classified as"unacceptable"it <br /> shall be removed from the Project and replaced with 12 hours. <br /> 2) Requests to use non-standard traffic control devices shall be <br /> submitted with the traffic control plans or by submitting a <br /> modification to the traffic control plan. <br /> c. Traffic Control Restrictions: <br /> 1) Project-Specific Street and Lane Closure Restrictions,if applicable, <br /> are specified in subparagraph 1.04.B.5.c.1 of this section. <br /> 2) In addition to the project-specific street and lane closure restrictions <br /> specified in subparagraph 1.04.B.5.c.1,the Project Manual traffic <br /> control plans shall be developed to comply with the following <br /> restrictions: <br /> a) Arterial Paving: <br /> VEHICULAR ACCESS AND PARKING 01 5500- 8 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.