My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alpine Waterproofing 8/23/2016
>
Contracts
>
Capital Contract
>
Alpine Waterproofing 8/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 10:34:45 AM
Creation date
8/29/2016 10:26:08 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alpine Waterproofing
Approval Date
8/23/2016
Council Approval Date
7/6/2016
Department
Facilities
Department Project Manager
Scott Pattison
Subject / Project Title
Police Headquarters Masonry Cleaning
Tracking Number
0000250
Total Compensation
$515,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Alpine Waterproofing & Masonry Restoration 11/16/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Alpine Waterproofing & Masonry Restoration 8/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> POLICE HQ—MASONRY CLEANING AND REPAIR APRIL 15,2016 <br /> control, for temporary sedimentation control, and for temporary water pollution control 1 <br /> work will be considered incidental to the Work and such costs shall be included in the <br /> Bid item prices for the various Bid items of Work listed in the Bid Form,unless a specific <br /> Bid item for temporary erosion/pollution/sedimentation control work is included in the <br /> Bid Form. <br /> 1.13 DEWATERING I <br /> A. The Contractor shall operate and maintain all pumps,tanks and other equipment <br /> necessary for the environmentally safe removal and disposal of water from the various <br /> parts of the work. The method proposed by the Contractor for removal of water from <br /> excavations shall be subject to the approval of the Owner. The Owner has the right and <br /> authority to disapprove any method proposed for discharge of water from excavations. I <br /> B. When discharge of water from the site is subject to approval of any Federal, State or local <br /> agency,the Contractor shall be responsible for obtaining such approval before <br /> commencing any pumping or de-watering operation. <br /> 1.14 LIABILITY AND PAYMENT <br /> A. The Contractor shall be liable for the payment of all fines and penalties resulting from <br /> failure to comply with the Federal, State and local pollution control regulations even <br /> though the Owner is on the job at the time of the violation. I <br /> B. Except as may be otherwise provided for in the Contract, costs pertaining to the <br /> prevention of environmental pollution and the preservation of public natural resources as <br /> outlined in the Contract shall be considered as incidental to the Work and such costs shall 111 <br /> be included in the Lump Sum Bid item price for the Work comprise in the Contract. <br /> PART 2 -PRODUCTS <br /> NOT USED I <br /> PART 3 -EXECUTION I <br /> NOT USED <br /> END OF SECTION 1 <br /> I <br /> I <br /> I <br /> TEMPORARY CONTROLS 01 5700- 8 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.