My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alpine Waterproofing 8/23/2016
>
Contracts
>
Capital Contract
>
Alpine Waterproofing 8/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 10:34:45 AM
Creation date
8/29/2016 10:26:08 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alpine Waterproofing
Approval Date
8/23/2016
Council Approval Date
7/6/2016
Department
Facilities
Department Project Manager
Scott Pattison
Subject / Project Title
Police Headquarters Masonry Cleaning
Tracking Number
0000250
Total Compensation
$515,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Alpine Waterproofing & Masonry Restoration 11/16/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Alpine Waterproofing & Masonry Restoration 8/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> POLICE HQ—MASONRY CLEANING AND REPAIR APRIL 15,2016 <br /> I <br /> SECTION 017300-EXECUTION <br /> PART 1 -GENERAL <br /> 1.1 RELATED DOCUMENTS <br /> A. Drawings and general provisions of the Contract, including General and Supplementary <br /> Conditions and other Division 01 Specification Sections,apply to this Section. <br /> 1.2 SUMMARY <br /> A. Section includes general administrative and procedural requirements governing execution of the <br /> Work including,but not limited to,the following: <br /> 1. Construction layout. <br /> 2. Field engineering and surveying. <br /> 3. Installation of the Work. <br /> 4. Cutting and patching. <br /> 5. Coordination of Owner-installed products. <br /> 6. Progress cleaning. <br /> 7. Starting and adjusting. <br /> 8. Protection of installed construction. <br /> B. Related Requirements: <br /> 1. Section 011000 "Summary" for limits on use of Project site. <br /> 2. Section 013300 "Submittal Procedures"for submitting surveys. <br /> 3. Section 017700 "Closeout Procedures" for submitting final property survey with Project <br /> Record Documents, recording of Owner-accepted deviations from indicated lines and <br /> levels,and final cleaning. <br /> 4. Section 024119 "Selective Demolition" for demolition and removal of selected portions <br /> of the building. <br /> 5. Section 078413 "Penetration Fire stopping" for patching penetrations in fire-rated <br /> construction. <br /> 1.3 DEFINITIONS <br /> 111 A. Cutting: Removal of in-place construction necessary to permit installation or performance of <br /> other work. <br /> B. Patching: Fitting and repair work required to restore construction to original conditions after <br /> installation of other work. <br /> 1.4 INFORMATIONAL SUBMITTALS <br /> A. Qualification Data: For professional engineer. <br /> EXECUTION 01 7300- 1 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.