My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alpine Waterproofing 8/23/2016
>
Contracts
>
Capital Contract
>
Alpine Waterproofing 8/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 10:34:45 AM
Creation date
8/29/2016 10:26:08 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alpine Waterproofing
Approval Date
8/23/2016
Council Approval Date
7/6/2016
Department
Facilities
Department Project Manager
Scott Pattison
Subject / Project Title
Police Headquarters Masonry Cleaning
Tracking Number
0000250
Total Compensation
$515,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Alpine Waterproofing & Masonry Restoration 11/16/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Alpine Waterproofing & Masonry Restoration 8/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> POLICE HQ—MASONRY CLEANING AND REPAIR APRIL 15,2016 <br /> I <br /> B. Certificates: Submit certificate signed by professional engineer certifying that location and <br /> elevation of improvements comply with requirements. <br /> C. Cutting and Patching Plan: Submit plan describing procedures at least 10 days prior to the time <br /> cutting and patching will be performed. Include the following information: <br /> 1. Extent: Describe reason for and extent of each occurrence of cutting and patching. <br /> 2. Changes to In-Place Construction: Describe anticipated results. Include changes to <br /> structural elements and operating components as well as changes in building appearance <br /> and other significant visual elements. <br /> 3. Products: List products to be used for patching and firms or entities that will perform <br /> patching work. <br /> 4. Dates: Indicate when cutting and patching will be performed. <br /> 5. Utilities and Mechanical and Electrical Systems: List services and systems that cutting <br /> and patching procedures will disturb or affect. List services and systems that will be <br /> relocated and those that will be temporarily out of service. Indicate length of time <br /> permanent services and systems will be disrupted. <br /> a. Include description of provisions for temporary services and systems during <br /> interruption of permanent services and systems. <br /> D. Landfill Receipts: Submit copy of receipts issued by a landfill facility, licensed to accept <br /> hazardous materials, for hazardous waste disposal. <br /> 1.5 QUALITY ASSURANCE I <br /> A. Cutting and Patching: Comply with requirements for and limitations on cutting and patching of <br /> construction elements. <br /> 1. Structural Elements: When cutting and patching structural elements, notify Architect of <br /> locations and details of cutting and await directions from Architect before proceeding. <br /> Shore,brace, and support structural elements during cutting and patching. Do not cut and <br /> patch structural elements in a manner that could change their load-carrying capacity or <br /> increase deflection <br /> 2. Operational Elements: Do not cut and patch operating elements and related components 1 <br /> in a manner that results in reducing their capacity to perform as intended or that results in <br /> increased maintenance or decreased operational life or safety. Operational elements <br /> include the following: <br /> a. Primary operational systems and equipment. <br /> b. Fire separation assemblies. <br /> c. Air or smoke barriers. <br /> d. Fire-suppression systems. <br /> e. Mechanical systems piping and ducts. <br /> f. Control systems. <br /> g. Communication systems. <br /> h. Fire-detection and-alarm systems. <br /> i. Electrical wiring systems. <br /> j. Operating systems of special construction. <br /> EXECUTION 01 7300-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.