Laserfiche WebLink
I <br /> POLICE HQ—MASONRY CLEANING AND REPAIR APRIL 15,2016 <br /> I <br /> 3.7 STARTING AND ADJUSTING <br /> A. Start equipment and operating components to confirm proper operation. Remove <br /> malfunctioning units,replace with new units,and retest. <br /> B. Adjust equipment for proper operation. Adjust operating components for proper operation <br /> without binding. <br /> C. Test each piece of equipment to verify proper operation. Test and adjust controls and safeties. <br /> Replace damaged and malfunctioning controls and equipment. <br /> D. Manufacturer's Field Service: Comply with qualification requirements in Section 014500 <br /> "Quality Control." <br /> 3.8 PROTECTION OF INSTALLED CONSTRUCTION <br /> A. Provide final protection and maintain conditions that ensure installed Work is without damage <br /> or deterioration at time of Substantial Completion. <br /> B. Comply with manufacturer's written instructions for temperature and relative humidity. <br /> END OF SECTION <br /> I <br /> I <br /> I <br /> r <br /> I <br /> I <br /> I <br /> I <br /> I <br /> EXECUTION 01 7300- 9 <br />