Laserfiche WebLink
POLICE HQ—MASONRY CLEANING AND REPAIR APRIL 15, 2016 <br /> iSECTION 01 7700—CLOSEOUT PROCEDURES <br /> PART 1 -GENERAL <br /> 1.01 DESCRIPTION <br /> A. Supplemental requirements to the General Conditions of the Contract and Specifications for <br /> administrative procedures in closing out the Work. <br /> 1 B. All conditions specified within Section 00710 General Conditions apply to this <br /> specification. <br /> 1 1.02 REQUIREMENTS FOR ACHIEVING SUBSTANTIAL COMPLETION <br /> A. Prior to requesting Owner's inspection for certification of Substantial Completion,the <br /> Contractor must meet the following requirements: <br /> 1. The facility shall be sufficiently complete and cleaned with all construction material <br /> removed,to allow the unrestricted use of the facility. <br /> 2. Submittal of pay request for all items completed in order to satisfy the requirements <br /> of Substantial Completion. <br /> 3. Complete and submit a release, granting the Owner's staff and facility users' full <br /> and unrestricted use of the Work and access to services and utilities including final <br /> building permit inspection and occupancy or temporary occupancy permits as <br /> required. <br /> 4. Record Documents have been submitted to and approved by the Owner in <br /> accordance with the requirements of Section 017839—Project Record Documents. <br /> 5. Operating and Maintenance Manuals have been submitted to and approved by the <br /> Owner in accordance with the requirements of Section 017823—Operating and <br /> Maintenance Data. <br /> 6. Warranties and Bonds Manual, including but not limited to special guarantees, <br /> workmanship and maintenance agreements, final certifications and similar <br /> documents have been provided and warranties inserted into the 0&M Manuals in <br /> accordance with the requirements of Section 017836—Warranties and Bonds. <br /> 7. Notification requesting that a Substantial Completion has been attained is to be <br /> submitted on the attached form. Once Owner concurs with Contractor that <br /> Substantial Completion has been attained,Owner will proceed with the development <br /> of a punch list and establishing the Substantial Completion Date. <br /> ' B. Process to achieve Substantial Completion: <br /> 1. Upon receipt of Contractor's request and if the Owner concurs that substantial <br /> ' completion has been met,the punch list inspection will be scheduled within ten(10) <br /> working days of the notification. If the Owner determines that the project is not <br /> Substantially Complete,the Owner will notify the Contractor of the portions of the <br /> ' <br /> 2. Work that must be completed before a punch list inspection can be scheduled. <br /> The Owner shall be responsible for preparing the punch list based upon the results of <br /> the inspection. If the inspection reveals that the Work is not Substantially <br /> Complete,the process in 1.02.B.I shall be repeated and the previously established <br /> Substantial Completion Date will be withdrawn until those items of work remaining <br /> to be completed have been completed. <br /> CLOSEOUT PROCEDURES 01 7700 - 1 <br /> I <br />