My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alpine Waterproofing 8/23/2016
>
Contracts
>
Capital Contract
>
Alpine Waterproofing 8/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 10:34:45 AM
Creation date
8/29/2016 10:26:08 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alpine Waterproofing
Approval Date
8/23/2016
Council Approval Date
7/6/2016
Department
Facilities
Department Project Manager
Scott Pattison
Subject / Project Title
Police Headquarters Masonry Cleaning
Tracking Number
0000250
Total Compensation
$515,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Alpine Waterproofing & Masonry Restoration 11/16/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Alpine Waterproofing & Masonry Restoration 8/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> POLICE HQ—MASONRY CLEANING AND REPAIR April 15, 2016 <br /> 1.04 SUBMITTAL REQUIREMENTS <br /> A. Submit one(1)hard cover binder with originals of each extended warranty and service and <br /> maintenance contracts specified in respective specification sections of the Project Manual to <br /> the Owner for their review and approval. Binder shall match the O&M Manual binders in <br /> Section 017823. Submit Approved binder and contents with the Approved O&M Manuals <br /> prior to application for final payment. <br /> 1.05 WARRANTY PROVISIONS <br /> A. The bonded warranty period for the Contractor extends for one year from the date of the <br /> Certificate of Completion. <br /> B. In the event of failure of any part of the Work during the warranty period,repair or remove <br /> and replace the defective components,including repair/replacement of any overlying or <br /> dependent construction,at no additional charge to the Owner. <br /> C. Repair and replacements shall be completed in accordance with all the requirements of the <br /> Contract Documents. Repaired or replaced work shall be an exact match for original work <br /> unless otherwise approved in writing by the Owner. <br /> D. In the event of repeated failure of any repaired component,or if the Owner is not satisfied <br /> that the quality of repairs meets the requirements of the Contract Documents,the Owner may <br /> order defective work completely removed and replaced with new. <br /> E. The Owner shall schedule a warranty inspection of all work completed under the Contract <br /> within one year of the date of the Certificate of Completion. The Owner shall establish the <br /> date,time and place for the warranty inspection and notify the Contractor to send <br /> representatives. The Owner and the Contractor shall identify valid warranty defects and <br /> prepare a warranty inspection list consisting of the items to be corrected. The Contractor <br /> and or Contractors Subcontractors shall correct and or replace the defective items or <br /> workmanship in a reasonable time,not to exceed two (2)months' time. Failure of the <br /> Contractor to correct agreed upon deficiencies may result in Owner referring the matter for <br /> corrective action in accordance with Section 00710 <br /> PART 2-PRODUCTS <br /> NOT USED <br /> PART 3 -EXECUTION <br /> NOT USED <br /> END OF SECTION I <br /> I <br /> WARRANTIES AND BONDS 01 7836-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.