My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alpine Waterproofing 8/23/2016
>
Contracts
>
Capital Contract
>
Alpine Waterproofing 8/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 10:34:45 AM
Creation date
8/29/2016 10:26:08 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alpine Waterproofing
Approval Date
8/23/2016
Council Approval Date
7/6/2016
Department
Facilities
Department Project Manager
Scott Pattison
Subject / Project Title
Police Headquarters Masonry Cleaning
Tracking Number
0000250
Total Compensation
$515,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Alpine Waterproofing & Masonry Restoration 11/16/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Alpine Waterproofing & Masonry Restoration 8/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> POLICE HQ— MASONRY CLEANING AND REPAIR APRIL 15, 2016 <br /> specified"are intentional in streamlined sections. Omitted words and phrases shall be supplied by <br /> inference. Similar types of provisions may appear in various parts of a section or articles within a part <br /> depending on the format of the section. The Contractor shall not take advantage of any variation of form, <br /> format or style in making claims for extra Work. <br /> The cross referencing of specification sections under the subparagraph heading"Related Sections include <br /> but are not necessarily limited to:"and elsewhere within each specification section is provided as an aid <br /> and convenience to the Contractor. The Contractor shall not rely on the cross referencing provided and <br /> shall be responsible to coordinate the entire Work under the Contract Documents and provide a complete <br /> Project whether or not the cross referencing is provided in each section or whether or not the cross <br /> referencing is complete. <br /> Reference to standards,specifications,manuals,or codes of any technical society, organization,or <br /> association,or to Laws or Regulations,whether such reference be specific or by implication, shall mean <br /> the standard,specification,manual,code,or Laws or Regulations in effect at the time of opening of Bids <br /> (or on the Effective Date of the Agreement if there were no Bids),except as may be otherwise specifically <br /> stated in the Contract Documents. ' <br /> No provision of a standard,specification, manual or code,or an instruction of a Supplier shall be effective <br /> to change the duties or responsibilities of Owner, Contractor,or Owner's Representative, or their <br /> Subcontractors,consultants, agents, or employees from those set forth in the Contract Documents. No <br /> such provision or instruction shall be effective to assign to Owner,or Owner's Representative,or their <br /> related entities,any duty or authority to supervise or direct the performance of the Work or any duty or <br /> authority to undertake responsibility inconsistent with the provisions of the Contract Documents. ' <br /> 2.2. DIVISION OF SPECIFICATIONS AND DRAWINGS <br /> Specifications and Drawings are divided into groups for convenience. These divisions are not for the <br /> purpose of apportioning Work or responsibility for Work among Subcontractors, Suppliers and <br /> manufacturers. The Contractor is responsible for all Work shown or described,regardless of location(s) <br /> in the Contract Documents. <br /> 2.3. DISCREPANCIES IN SPECIFICATIONS AND DRAWINGS <br /> 2.3.1. Errors and Omissions <br /> If the Contractor,in the course of the Work,becomes aware of any errors or omissions in the Contract <br /> Documents or in the Owner's field work,he or she shall immediately inform the Owner's Representative <br /> in writing. The Owner's Representative will promptly review the matter and if he or she finds an error or <br /> omission has been made,then he or she will determine the corrective actions and advise the Contractor <br /> accordingly. If the corrective work associated with an error or omission significantly increases or <br /> decreases the amount of Work called for in the Contract,the Owner will issue an appropriate Change <br /> Order. After discovery by the Contractor of an error or omission,related work performed by the <br /> Contractor shall be done at its risk unless authorized by the Owner's Representative and approved by the <br /> Owner. Omissions from the Drawings or Specifications or the misdescription of details of Work that are <br /> manifestly necessary to carry out the intent of the Drawings and Specifications,or that are customarily <br /> performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the <br /> Work,but they shall be performed as if fully and correctly set forth and described in the Drawings and <br /> Specifications. <br /> 2.3.2. Conflicting Provisions <br /> Figure dimensions on drawings shall govern over scale dimensions and detail drawings shall govern over <br /> general drawings. In the event an item of Work is described differently in two or more locations on the <br /> Drawings and in the Specifications,the Contractor shall,upon request of the Owner's Representative, <br /> submit in writing to the Owner's Representative the description upon which the Contractor relied in <br /> GENERAL CONDITIONS 00 7200- 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.