My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alpine Waterproofing 8/23/2016
>
Contracts
>
Capital Contract
>
Alpine Waterproofing 8/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 10:34:45 AM
Creation date
8/29/2016 10:26:08 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alpine Waterproofing
Approval Date
8/23/2016
Council Approval Date
7/6/2016
Department
Facilities
Department Project Manager
Scott Pattison
Subject / Project Title
Police Headquarters Masonry Cleaning
Tracking Number
0000250
Total Compensation
$515,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Alpine Waterproofing & Masonry Restoration 11/16/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Alpine Waterproofing & Masonry Restoration 8/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ' POLICE HQ— MASONRY CLEANING AND REPAIR APRIL 15, 2016 <br /> preparing its Bid or laying out the Work. If the Owner's Representative directs the Contractor to perform <br /> ' Work in a manner other than that contemplated by the Contractor in preparing its Bid or laying out the <br /> Work,Change Order procedures will be followed. In this event,the Contractor shall submit to the <br /> Owner's Representative such supporting information, including bidding or layout documents, as may <br /> reasonably be necessary for the Owner's Representative to determine whether the Contract Sum is <br /> increased, decreased or unchanged by the Change Order. <br /> 2.3.3. Utilities <br /> ' 2.3.3.1 General <br /> The Owner has endeavored to determine the existence of utilities at the Site of the Work from the records <br /> of the owners of known utilities in the vicinity of the Work. The positions of these utilities as derived <br /> ' from such records are shown on the Drawings. No excavations were made to verify the locations shown <br /> for underground utilities. The service connections to these utilities are not shown on the Drawings. It <br /> shall be the responsibility of the Contractor to determine the exact location of utilities and service <br /> ' connections thereto. Such field verification must be performed in sufficient time so as not to impede the <br /> progress of the Work or fabrication of materials to be incorporated into the Work. The Contractor shall <br /> call the Utility Location Request Center(one call center)for location of utilities in the field not less than <br /> two(2)nor more than(10)ten business days before the scheduled date of commencement of excavation. <br /> ' The Contractor shall make its own investigations,including exploratory excavations,to determine the <br /> locations and type of existing utilities,including service connections,prior to commencing work that <br /> could result in damage to such utilities. The Contractor shall immediately notify the Owner's <br /> Representative as to any utility discovered by him in a different position than shown on the Drawings or <br /> which is not shown on the Drawings. No excavation shall begin until all known facilities in the <br /> excavation areas have been marked. Contractor shall coordinate its activities with the utility provider. <br /> t Contractor shall bear the cost of maintaining utility service. <br /> The Contractor should be aware of,and comply with,Chapter 19.122 RCW,a law relating to <br /> underground utilities. The Owner shall not pay Contractor any of Contractor's cost of complying with <br /> ' this law,and repairing or indemnifying any damage or injury arising out of Contractor's failure to comply <br /> with this law. <br /> Owner does not represent or warrant who may be obligated to pay for the cost of relocation or temporary <br /> ' maintenance of the utility. Contractor shall investigate whether such cost must be borne by the owner of <br /> the utility. <br /> Governmental agencies and owners of utilities reserve the right to enter upon streets,alleys,rights-of- <br /> !! way, or easements for the purpose of making changes in their property made necessary by the Work and <br /> for the purpose of maintaining and making repairs to their property. <br /> 2.3.3.2 Known Utilities <br /> ' The Contractor shall provide at its sole expense all labor,equipment,materials and services necessary to <br /> remove,relocate,or maintain utilities specified on the Drawings. The work on each utility shall be <br /> performed in a manner satisfactory to the utility owner. The utility owner has the option of doing such <br /> work with its own forces at the Contractor's expense,or permitting the work to be performed by the <br /> Contractor. <br /> 2.3.3.3 Service Connections <br /> ' Locations of service connections are not identified on the Drawings. The Contractor shall provide at its <br /> sole expense all labor,equipment and material to remove,relocate or maintain service connections. Work <br /> on service connections shall be performed in a manner satisfactory to the service connection owner. The <br /> service connection owner has the option of doing such work with its own force at the Contractor's <br /> expense,or permitting the work to be performed by the Contractor. <br /> GENERAL CONDITIONS 00 7200- 7 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.