My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alpine Waterproofing 8/23/2016
>
Contracts
>
Capital Contract
>
Alpine Waterproofing 8/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 10:34:45 AM
Creation date
8/29/2016 10:26:08 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alpine Waterproofing
Approval Date
8/23/2016
Council Approval Date
7/6/2016
Department
Facilities
Department Project Manager
Scott Pattison
Subject / Project Title
Police Headquarters Masonry Cleaning
Tracking Number
0000250
Total Compensation
$515,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Alpine Waterproofing & Masonry Restoration 11/16/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Alpine Waterproofing & Masonry Restoration 8/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> POLICE HQ- MASONRY CLEANING AND REPAIR APRIL 15. 2016 <br /> I <br /> including costs of Delays, inefficiencies and impacts,related to, arising out of,or resulting from,any <br /> I Work described in the Change Order. <br /> The Contractor shall obtain written consent of the surety or sureties if the Owner's Representative <br /> requests such consent. <br /> f6.4 VALUE ENGINEERING AND COST SHARING <br /> The Contractor may submit proposals for changing the Drawings, Specifications,or other requirements of <br /> 1 the Contract Documents and the Owner, in its sole discretion,may accept or reject such proposals. If <br /> accepted by the Owner and if the proposal decreases the direct, actual costs of constructing the Work, the <br /> Contract Sum shall be reduced by fifty percent(50%)of the direct,actual construction cost saved. <br /> Because the Owner has the sole discretion whether to consider,accept or reject the Contractor's proposal <br /> I and the Contractor has no right to require the Owner to consider or accept such proposals,the Owner's <br /> decision is not reviewable by any court. This subsection applies only to change proposals initiated solely <br /> by the Contractor(or its Subcontractors and Suppliers)and does not apply to change proposals requested <br /> I or initiated by the Owner or the Owner's Representative. The Owner is not obligated or required to <br /> consider any Contractor initiated change proposals and may, in its sole discretion,refuse to do so. Under <br /> no circumstances shall the Contractor be entitled to additional compensation arising out of,or related to, <br /> 1 the Owner's refusal to consider or approve a Contractor initiated change proposal. The Contractor shall <br /> not do any of the following without the express written agreement of the Owner: fail to perform any <br /> Work; commence performance of any proposed change; reduce its resources assigned to performance of <br /> the Work in order to prepare a change proposal or in anticipation of approval of a change proposal; adjust <br /> I or change the project schedule or take any action or fail to do any action that would affect the Completion <br /> Date of the Work; take any action or fail to take any action arising out of the Contractor's change <br /> proposal that would result in the Contractor seeking an adjustment upward of the Contract Sum. <br /> 1 7. LABOR STANDARDS <br /> I 7.1. WAGES OF EMPLOYEES <br /> 7.1.1. General <br /> Pursuant to the requirements of Chapter 39.12 RCW,the Contractor and each Subcontractor or other <br /> Iperson doing the whole or any part of Work to be performed under this Contract in the State of <br /> Washington shall pay each employee working in the State of Washington an amount not less than the <br /> general prevailing rate of wage,as specified by the Industrial Statistician of the Department of Labor and <br /> I Industries of Washington State,paid in the vicinity of the Work to be performed under this Contract for <br /> the particular grade or occupation of each employee <br /> Any employee whose type of work is not covered by any of the classified wage rates specified by the <br /> I Industrial Statistician shall be paid not less than the rate of wage listed for the classification that most <br /> nearly corresponds to the type of work performed. <br /> In case any Dispute arises as to what are the prevailing rates of wages for work of a similar nature that <br /> III cannot be adjusted by the parties in interest, including labor and management representatives,the matter <br /> shall be referred for arbitration to the Director of the Department of Labor and Industries of the State of <br /> Washington,and his or her decision therein shall be final and conclusive and binding on all parties <br /> I involved in the Dispute. The schedule of prevailing wage rates as determined by the Industrial <br /> Statistician for the locality or localities where this Contract will be performed are by this reference made a <br /> part of this Contract as though fully set forth herein. The Contractor shall be held responsible for <br /> I notifying its Subcontractors of these wage requirements. Failure by either the Contractor or any <br /> Subcontractors to comply with requirements of Chapter 39.12 RCW will result in delay of payment to the <br /> Contractor and/or imposition of other sanctions as may be available under the law and this Contract. <br /> GENERAL CONDITIONS 00 7200 -23 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.