<br /> POLICE HQ- MASONRY CLEANING AND REPAIR APRIL 15, 2016
<br /> labor Dispute with the Contractor or its Subcontractors or Suppliers interferes in any way with access to
<br /> the Owner's property by any persons,the Contractor shall promptly and expeditiously take all reasonable
<br /> actions to eliminate or minimize such interference,including but not limited to: (1)utilizing all
<br /> reasonable means of restricting any picketing to a single entrance to the Owner's property; (2)posting
<br /> notices or signs which advise interested persons and labor organizations that a particular entrance to the
<br /> Owner's property is for the employees of"primary" or,as the case may be, "neutral" employers; (3)
<br /> policing entrances to ensure that only authorized personnel may use those entrances; (4)notifying all
<br /> interested labor organizations of the "primary" or"neutral" status of particular entrances; and(5) in the
<br /> event any such picketing or concerted activity is unlawful or has a secondary impact upon the employees
<br /> of neutral employers,promptly and expeditiously taking appropriate action to seek recourse through the
<br /> appropriate governmental agency or state or federal courts to limit the location of such picketing so as to
<br /> reduce the impact thereof upon neutral employers.
<br /> The Owner will cooperate with the Contractor to accomplish the foregoing actions and will render
<br /> assistance as may be in the best interests of the Owner. However,the Owner shall have the right to direct
<br /> the Contractor to modify any of the foregoing actions the Contractor has taken or plans to take or to
<br /> overrule such actions,to designate the entrances to be used as "primary" or"neutral"entrances,and to
<br /> take appropriate legal action in order to protect the Owner's property and interests. In any event,the
<br /> Contractor shall be liable for all Delays and costs,including costs to the Owner,and actual damages
<br /> resulting from the relocation,rerouting,Delays or actions required to maintain the uninterrupted progress
<br /> of the Work. Failure by the Contractor to take the actions described above or to comply with the
<br /> directives of the Owner shall be considered a breach of this Contract and the Owner may terminate the
<br /> Contract or suspend the Contractor as provided in this Contract.
<br /> 8. MATERIAL, EQUIPMENT,WORKMANSHIP AND CONSTRUCTION UTILITIES
<br /> 1 8.1. GENERAL
<br /> Unless otherwise specifically stated in the Contract Documents,the Contractor shall provide and pay for
<br /> materials,labor,tools, Equipment, water, light,power,transportation, supervision,and temporary
<br /> construction of any nature,and other services and facilities of any nature,whatsoever necessary, to
<br /> execute,complete and deliver the Work within the specified time. Contractor shall be liable for all power
<br /> and water costs until Substantial Completion,whether such power or water is provided by temporary or
<br /> permanent facilities. Owner shall not be liable for any costs or Delays arising out of or caused by the
<br /> availability or lack of availability of permanent power or utilities. Material and Equipment shall be new
<br /> and of the specified quality. Equipment offered shall be new or current specified models. This
<br /> requirement does not apply to minor details,or to thoroughly demonstrated improvements in design or in
<br /> materials of construction. Construction Work shall be executed in conformity with the standard practice
<br /> of the trade.
<br /> 8.2. PRODUCT DATA
<br /> When specified,the Contractor shall provide data required for inspecting, testing,operating, or
<br /> maintaining parts of the Work. Unless otherwise specified,such data shall be provided at the time the
<br /> referenced material or Equipment is delivered to the job Site. The data shall be as specified and shall
<br /> include,unless otherwise specified, such items as shop drawings,erection drawings, reinforcing steel
<br /> schedules, testing and adjusting instructions,operations manuals,maintenance procedures,parts lists,and
<br /> record drawings. Such data shall be provided as part of the Work under this Contract and its acceptability
<br /> determined by the Owner in its sole discretion.
<br /> 8.3. QUALITY
<br /> Where detailed Specifications of materials, Equipment,or construction Work are not set forth,the
<br /> Contractor shall perform the Work using materials and Equipment of a quality comparable to the
<br /> GENERAL CONDITIONS 00 7200-25