Laserfiche WebLink
5 <br />� <br />• <br />• <br />Resideni�ial Photovoltaic OTC Permit Application <br />� � 5 0� -oz�s <br />Contractors can apply for an Over-The-Counter (OTCJ permit where the PV system rneets the requirements listed <br />.. in this Checklisf. All projecf plans and supporting documentation musi be provided on site for the inspector, <br />_m��a_vaT� �� �i� IM�L�T�� �� d��P���.��i � -�_--___ <br />� Prrojec� In�orr�iatio� <br />� ����;�b���i��� u�� ����,�6' (�fP9J��,d �J�IoIBG'�8��'u�fi' G�BS����9L��� ����°b��o��;��u��go <br />1. PV system is designed and proposed for a detached one- or two-family dwelling or <br />townhouse not more than three stories above grade or detached accessory structure that <br />is code compliant to setbacks and height, or code allows expansion of nonconformity for <br />solar modules. [IRC 101,2] <br />2. Modules on pitched roofs do not exceed the highest point of the roof unless approved by <br />the local jurisdiction. <br />3. Rooftop is made from lightweight materia� such �as a single layer of composition shingles, <br />metal roofing, lightweight masonry, or cedar shingles. <br />4. The installation shall comply with the manufacturer's instructions. [IRC M2302,2] <br />5. The installation shall meet the requirements of NFPA 70 National Electric Code, and all <br />required electrical permit(s} must be obtained from the Authority HavingJurisdiction to <br />administer the electrical code. [IRC M2302,2] <br />6. ihe installation shall meet the requirements of the International Fire Code as amended <br />by WA State. [IRC M2302.2] <br />7, The PV system is designed for the wind speed of the local area, and will be installed per <br />the manufacturer's specifications. [1RC M2302,2.1(1)] . � <br />8. The ground snow load does not exceed 70 pounds per square foot. [IRC M2302,2.1(2)] <br />9. Total dead load of modules, supports, mountings, raceways and all other appurtenances <br />weigh no more thanfour poands per�square foot. [I C M2302,2,1(3)] � <br />Enter total dead load of system (Ibs/ftZ): �. <br />10. To address uplift, modules are mounted no higher than 18" above the surface of the <br />roofing to which they are affixed. [IRC M2302,2,1(4)] <br />� <br />Yes <br />No <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />p <br />❑ <br />❑ <br />❑ <br />