My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4806 SEAHURST AVE 2016-08-30
>
Address Records
>
SEAHURST AVE
>
4806
>
4806 SEAHURST AVE 2016-08-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2017 10:30:18 PM
Creation date
8/30/2016 4:00:38 PM
Metadata
Fields
Template:
Address Document
Street Name
SEAHURST AVE
Street Number
4806
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />11. Supports for solar modules are installed to spread the dead load across as many roof- <br />framing members as needed to ensure that no point load exceeds fifty (50) pounds, � ❑ <br />[IRC M2302.2,1(5)] ' l <br />12. The photovoltaic modules and supporting structure shail be constructed of <br />noncombustible materials or fire-retardant treated wood equivalent to that required for � ❑ <br />fhe roof construction. [IRC M2302.2.1] <br />13. Roof and wall penetrations shall be flashed and sealed to prevent entry of water, � � <br />rodents, and insects. [IRC M2302.2.2] <br />14. PV modules are listed and labeled with a fire classification in accordance with UL 1703. � � <br />[IRC M2302.2.3] ' <br />Comments: � <br />�=°�'=T;;'' If you answered yes to all of the above questions, the project qualifies for the over-fhe- <br />counter permi�ting process. <br />�` Determi�e if your projec� qualifies for an Over-the-Counter electrical permit <br />Yes No N/A <br />1. PV modules, inverters, and combiner boxes are identified for use in PV sy.stems. � <br />2. The inverters are listed and labeled in accordance with UL 1741 and are listed for � <br />utility interaction, [IRC M2302.4) <br />3. The AC interconnection point is on the load side of service disconnect. [NEC 690.64(B)) <br />❑ <br />4. The system meets all current NEC, Gity and Washington Cities Electrical Code � <br />requirements. <br />5. For Split-Buss modules the AC interconnection must be one of the six service � � <br />disconnects. � <br />6. Maximum load added to the panelboard is based on the rating of the panelboards bus/main OCPD <br />combination in accordance with NEC 705.12(D)(2)(3)(b), and is limited to (check combination that <br />applies): � <br />❑225 amp bus/200 amp main OCPD -13,440 AC watts, maximum 70 amp inverter OCPD. <br />❑225 amp bus/225 amp main OCPD - 8,640 AC watts, maximum 45 amp inverter OCPD. <br />�7200 amp bus/200 amp main OCPD - 7,860 AC watts, maximum 40 amp inverter OCPD, <br />❑150 amp bus/150 amp main OCPD - 5,760 AC watts, maximum 30 amp inverter OCPD. <br />❑125 amp bus/125 amp main OCPD - 4,800 AC watts, maximum 25 amp inverter OCPD, <br />0125 amp bus/100 amp main OCPD - 9,600 AC watts, maximum 50 amp inverter OCPD. <br />
The URL can be used to link to this page
Your browser does not support the video tag.