My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9401 SHARON DR 2019-11-04
>
Address Records
>
SHARON DR
>
9401
>
9401 SHARON DR 2019-11-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 4:25:49 PM
Creation date
8/31/2016 8:15:59 AM
Metadata
Fields
Template:
Address Document
Street Name
SHARON DR
Street Number
9401
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Meg Haley <br />To: <br />Subject: <br />Attachments: <br />Blake <br />RE: Corrections letter for 61403-011 Roofing permit and access holes <br />20140312134349793.pdf <br />RE: Corrections respanse to elecironicaily submitted building permit far 81403-f?11 <br />Hi Blake, <br />in response to your application for a construction permit, your plans have been examined and you are advised that this <br />is an incomplete submittal. Plan reuiew wiil resume when the requested information is submitted. Additional re�isions <br />may be necessary befare a permit can be issued. Please review and respond to the comments below. All required <br />submittals must be of sufficient detail and information to ensure that the proposed structure will be constructed in <br />compliance with all adopted codes. <br />1. The drawings and detai3s should show the full scope of work so that someone else could perform the work <br />without consulting you, as we discussed on the phone taday. <br />The Washington State Energy Code applies to the replacement ar compliance requirements for the exposed <br />ir�suiation and new work, per WSEC C101.4.3. The method of campliance with the WSEC should be shown on <br />�he drawings. Attached is an excerpt from the energy code for this section. <br />3. Please submit a written clarification as to why the 44 access holes are being cut into the roof for the mechanical <br />units, inclt�ding the size, and if any additional wiring or ducting will be �nstalied. Additional permits may not be <br />required, depending on the purpose of the access holes. <br />The drawings and permit application have been processed as an intake by the Permit Technicians. <br />Thanks, <br />Meg <br />From: Blake [mailto:blakeCa�meyerbrothersroofing.com] <br />Sent: Wednesday, March 12, 2014 11:59 AM <br />To: Meg Haley <br />Subject: Roof Permit Application Mukilteo School Administration Building <br />Hi Meg, <br />I was transferred to you when I asked to speak with somebody regarding commercial re-roof permit. I just left you voice <br />mail but cut off before done. You worked with me on the Providence Hospital Re-roof permit. This is similar situation <br />where there are no plans/specs other than 1 roof plan I have attached here. The permit application has description of <br />work. Please let me know what else you will need. <br />Thanks, <br />Blake McKinnon <br />��1F:.k'1 IA � �jSiC)�4�8�5# &iS <br />18211 East Valley Highway <br />
The URL can be used to link to this page
Your browser does not support the video tag.