Laserfiche WebLink
4 <br /> EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Call for Request of"Statement Briefing COUNCIL BILL# <br /> of Qualifications"for the Proposed Action Originating Department Public Works <br /> Replacement of Reservoir 2 Consent Contact Person Souheil Nasr <br /> X Action Phone Number 425-257-7210 <br /> First Reading FOR AGENDA OF August 24, 2016 <br /> Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Precedin6 Action Attachments Department(s)Approval <br /> Rucker Hill,Edward Request for"Statement Public Works <br /> Avenue west of Tulalip of Qualifications" <br /> Avenue <br /> Amount Budgeted $15,000,000 Fund 336 <br /> Expenditure Required $2,000 Account Number(s): UP 3658-1 <br /> Budget Remaining $14,998,000 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The 2014 Comprehensive Water Plan recommended replacement of the 105-year old Reservoir 2 (located on <br /> Rucker Hill on Edward Avenue, west of Tulalip Avenue) with a new 5 MG storage reservoir to be located <br /> either in the east half of Reservoir 2 or on the property adjacent to it. The new storage reservoir will obviate <br /> the need for the existing Reservoir 2,thus eliminating the risk for a catastrophic failure of the western and <br /> southern embankments of the reservoir which are in poor condition. Also,the existing Valve House No. 2 is <br /> over 75 years old. <br /> Reid Middleton has performed a visual examination of the building to investigate its structural condition and <br /> to assess its probable seismic performance. The investigation concluded that the Valve House is both <br /> seismically deficient and poorly configured for valve maintenance. The report recommended the replacement <br /> of the Valve House. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize Call for Request of"Statement of Qualific4ions" for the Replacement of Reservoir 2 <br />