My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/08/24 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/08/24 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 11:02:12 AM
Creation date
9/1/2016 11:01:36 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/24/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br /> J <br /> CITY OF EVERETT <br /> PUBLIC WORKS DEPARTMENT <br /> REQUEST FOR STATEMENT OF QUALIFICATIONS(SOQ) <br /> Replacement of Reservoir 2 <br /> The City of Everett is requesting a Statement of Qualifications(SOQ)for the replacement of its Water <br /> Reservoir 2 and Valve House No.2 located on Rucker Hill on Edwards Avenue west of Tulalip Avenue. <br /> The 2014 Comprehensive Water Plan recommended replacement of the 105-year old, 10 MG Reservoir 2 <br /> • <br /> • with a new 5 MG storage tank to be located within Reservoirs 2/4 site.The new storage reservoir will <br /> obviate the need for the existing Reservoir 2,thus eliminating the risk for a catastrophic failure of the <br /> southern and western embankments of the reservoir which are in poor condition.Also,the existing Valve <br /> House No.2 is in excess of 75 years old and has exceeded its useful life. The City conducted a visual <br /> examination of the building to investigate its structural condition and to assess its probable seismic <br /> performance and concluded that the Valve House is both seismically deficient and poorly configured for <br /> valve maintenance.The City of Everett Capital Improvement Program includes budget for the <br /> replacement of Reservoir 2 and Valve House No. 2.The replacement is scheduled for 2018/2019. The <br /> work may include but is not limited to surveying,preparation of base maps,geotechnical evaluation, <br /> environmental and construction permitting,design, evaluation of construction methods and scheduling, <br /> preparation of bid documents,support services during construction,and construction management. <br /> Minimum Information Required: <br /> • The finn's experience in the design of storage reservoirs of similar size. <br /> • The experience of the proposed project manager and individuals who will be working on the <br /> preparation of the plans and specifications <br /> • Approach to managing and completing the project <br /> • A draft schedule for the completion of the project(Design,Bidding and Construction) <br /> • Approach to communicating with the City. Be specific about what is communicated and the <br /> form and frequency of your communications. <br /> The SOQ will be evaluated,and based on the results,the City will either enter directly into contract <br /> negotiations with the most qualified consultant,or will interview as many as necessary before final <br /> selection is made. <br /> Submittal shall be a maximum of 25 pages(double sided)or less of 11-point font,including resumes and <br /> cover letter. All communications regarding this project shall be directed only to Souheil Nasr,P.E. at <br /> (425)257-7210 or snasraeverettwa.gov.Communicating with any other City employee on this project is <br /> not permitted. <br /> Six(6)paper copies of the submittal shall be delivered to the City of Everett,3200 Cedar Street,Everett, <br /> Washington 98201;Attn: Souheil Nasr. <br /> The deadline for submittals is 2:00 p.m.,Friday,September 16,2016. <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.