My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc Change Order 1 8/30/2016 Change Order 1
>
Contracts
>
Capital Contract
>
American Process Group Inc Change Order 1 8/30/2016 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2016 11:16:39 AM
Creation date
9/12/2016 11:16:37 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc Change Order 1
Approval Date
8/30/2016
Department
Public Works
Department Project Manager
Chris Chesson
Subject / Project Title
2016 Biosolids Removal
Public Works WO Number
UT 2600-4
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0000138
Total Compensation
$15,713.29
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
American Process Group 6/1/2016
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project:2016 Biosolids Removal <br /> Change Order No. 1 <br /> Change Order Effective Date: Sept,2016 <br /> Contractor and City agree as follows: <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. In full and complete compensation for the changes described in Exhibit A, including all <br /> direct and indirect costs and impacts, the contract price shall be adjusted as described <br /> in this Change Order. <br /> 3. The duration of the Contract shall be adjusted to the extent described in this Change <br /> Order. <br /> 4. Contractor waives and releases any and all claims arising out of, or related to, this <br /> Change Order, the work described in Exhibit A, and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order, including, but <br /> not limited to, claims for equitable adjustment of time and compensation, delay, impact, <br /> overhead, or inefficiencies. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition, protest, dispute, claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for <br /> notice of a differing site condition, protest, dispute, claim, or Contract Claim that ends <br /> after the date of this Change Order, but relates to work performed prior to the date of <br /> this Change Order, then this provision does not apply if the Contractor timely and <br /> properly submits such notice <br /> 5. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> CITY <br /> Attest: Approved As to Form: <br /> //44114144A<_-.AaNn;(--)4 J.14ar <br /> Ma City Clerk City Attorney <br /> Date: ei' jit Date: 5 d 671--0> e: g0�� <br /> Recommended By: <br /> Construction Project Engineer (if Engineering Department Director <br /> Manager(if applicable) Manager(if <br /> applicable) appy•. ► e) <br /> ode <br /> ate: ate: 8hf//6 Date: tate: li � cp <br /> CONTRACTSR <br /> By Cakk,1/4-C-Pc._ Date: )(r, 2o1(, <br /> Officer <br /> COLLIE-EA P&AkL <br />
The URL can be used to link to this page
Your browser does not support the video tag.