My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snohomish County 9/2/2016
>
Contracts
>
Agreement
>
Interlocal Agreements
>
Snohomish County 9/2/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:14 AM
Creation date
9/13/2016 11:37:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish County
Approval Date
9/2/2016
Council Approval Date
6/15/2016
Department
Public Works
Department Project Manager
Jim Miller
Subject / Project Title
Smith Island Restoration
Tracking Number
0000272
Total Compensation
$683,900.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 2: Exhibit B Table <br /> General Shared Cost Work Items <br /> for City of Everett and Snohomish County <br /> for the Smith Island Project <br /> Total Cost <br /> Shared Cost Items County Share City Share ($)(1) <br /> Item ILA Cost Element Percent Percent ($) <br /> Section (%) (%) <br /> A. SEPA AND STUDIES TO SUPPORT SEPA <br /> 1.1.1 SEPA and studies to 87.0% $ 905,000 13.0% $ 135,000 $ 1,040,000 <br /> support SEPA <br /> B. PRE-CONSTRUCTION COSTS <br /> 1.1.2 General 87.0% $ 383,000 13.0% $ 57,000 $ 440,000 <br /> (a) SEPA Review 280.000 <br /> (b) Design and 150,000 <br /> Analysis <br /> 1.1.4 Force Account— 87.0% $ 17,000 13.0% $ 3,000 $ 20,000 <br /> Design for Force <br /> Account <br /> 1.6 Smith Island Hydraulic <br /> Analysis (Tidal 50% $ 25,000 50% $ 25,000 50,000 <br /> Channel) (2) <br /> C. Construction Project Management Costs <br /> 1.1.3 General 87.0% $ 87,000 13.0% $ 13,000 $ 100,000 <br /> D. Project Construction Costs <br /> 1.1.4 General 87.0% $ 409,000 13.0% $ 61,000 $ 470,000 <br /> (1) PSE <br /> protection <br /> 1.1.4 Force Account 87.0% $ 87,000 13.0% $ 13,000 $ 100,000 <br /> E. SUBTOTAL A. THROUGH D. $ 1,913,000 $ 307,000 $ 2,220,000 <br /> INTERGOVERNMENTAL AGREEMENT FOR <br /> IMPLEMENTATION OF THE SMITH ISLAND RESTORATION PROJECT PAGE 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.