Laserfiche WebLink
Section 2: Exhibit B Table <br /> General Shared Cost Work Items <br /> for City of Everett and Snohomish County <br /> for the Smith Island Project <br /> Total Cost <br /> Shared Cost Items County Share City Share ($)(1) <br /> Item ILA Cost Element Percent Percent ($) <br /> Section (%) (%) <br /> A. SEPA AND STUDIES TO SUPPORT SEPA <br /> 1.1.1 SEPA and studies to 87.0% $ 905,000 13.0% $ 135,000 $ 1,040,000 <br /> support SEPA <br /> B. PRE-CONSTRUCTION COSTS <br /> 1.1.2 General 87.0% $ 383,000 13.0% $ 57,000 $ 440,000 <br /> (a) SEPA Review 280.000 <br /> (b) Design and 150,000 <br /> Analysis <br /> 1.1.4 Force Account— 87.0% $ 17,000 13.0% $ 3,000 $ 20,000 <br /> Design for Force <br /> Account <br /> 1.6 Smith Island Hydraulic <br /> Analysis (Tidal 50% $ 25,000 50% $ 25,000 50,000 <br /> Channel) (2) <br /> C. Construction Project Management Costs <br /> 1.1.3 General 87.0% $ 87,000 13.0% $ 13,000 $ 100,000 <br /> D. Project Construction Costs <br /> 1.1.4 General 87.0% $ 409,000 13.0% $ 61,000 $ 470,000 <br /> (1) PSE <br /> protection <br /> 1.1.4 Force Account 87.0% $ 87,000 13.0% $ 13,000 $ 100,000 <br /> E. SUBTOTAL A. THROUGH D. $ 1,913,000 $ 307,000 $ 2,220,000 <br /> INTERGOVERNMENTAL AGREEMENT FOR <br /> IMPLEMENTATION OF THE SMITH ISLAND RESTORATION PROJECT PAGE 28 <br />