Laserfiche WebLink
constructed. For the purposes of this Agreement, the 12th Street <br /> NE Right of Way(ROW) shall be deemed City property. <br /> (e) In the event the County constructs the Dike Connection on City <br /> property, as contemplated under sub-section 1.5.2(c) above, the <br /> maximum estimated construction cost of the Dike Connection to <br /> the City shall be agreed to as $130,000 for all work on City <br /> property for the work quantity assumptions listed in the Exhibit B <br /> Table. If the winning bid for the County's setback dike work for <br /> the Dike Connection on City property exceeds this amount, this <br /> maximum amount shall be subject to renegotiation by the parties. <br /> (f) In the event the County constructs all or a portion of the Dike <br /> Connection on City property, as contemplated under sub-section <br /> 1.5.2(c) above,the City agrees to make available the City's <br /> previous compaction test results. The County has provided the City <br /> an opportunity to review and comment on the design of the Dike <br /> Connection. <br /> 1.5.4 Any County billing to the City for Dike Connection work on City property <br /> shall be conducted under the procedures of Section 1.4.5. <br /> 1.6 Smith Island Hydraulic Analysis (Tidal Channel and Breaches) <br /> 1.6.1 The City and County agreed in 2013 to conduct an hydraulic analysis of <br /> the Smith Island tidal channel, to be managed by the County. The scope <br /> and budget shall subject to written agreement between the parties. The <br /> cost for the analysis shall be subject to an equal (50/50) cost share <br /> between the City and the County. <br /> 1.6.2 County billings to the City shall be conducted under the procedures of <br /> Section 1.4.5 of this Exhibit. <br /> INTERGOVERNMENTAL AGREEMENT FOR <br /> IMPLEMENTATION OF THE SMITH ISLAND RESTORATION PROJECT PAGE 27 <br />