Laserfiche WebLink
the planning director as needed to provide for the reasonable accommodation of mixed-use and <br /> commercial development encouraged by the comprehensive plan. When multiple-family housing <br /> is proposed to be added as a later phase to an existing multiple-family development which does <br /> not meet the requirements contained herein, the requirements contained herein shall apply, but <br /> may be modified by the planning director as needed to provide for continuity between the <br /> existing and proposed phases of development. <br /> Section 12: Ordinance 1671-89, as amended, is hereby amended by the addition of the <br /> following chapter, Chapter 31B, establishing additional standards and guidelines for the E- <br /> 1(Evergreen Way) and MUO (Mixed Use Overlay) zones, which shall read as follows: <br /> 31B.010 E-1 (Evergreen Way) Zone and MUO (Mixed Use Overlay) Zone. Two zones <br /> are hereby established by this chapter of the Zoning Code. The E-1 Zone applies as the <br /> underlying Use Zone within the entire commercial corridor. The MUO is an overlay established <br /> in the areas surrounding the Swift Bus Rapid Transit stations. The E-1 regulations apply to the <br /> entire corridor, as indicated on the Zoning Map. The MUO applies an additional set of design <br /> and development standards as an overlay to the E-1 use zone in those areas designated with the <br /> MUO symbol on the Zoning Map, and may limit certain uses that are otherwise permitted in the <br /> E-1 zone. This chapter describes standards for both the underlying E-1 zone and the Mixed Use <br /> Overlay zone. <br /> 31B.015 Applicability. <br /> The design and development standards and guidelines herein apply to new construction and <br /> remodeling activities in the E-1 and MUO zones, with the following exceptions: <br /> A. Major exterior remodels include all remodels within a three-year period whose value exceeds <br /> fifty percent of the value of the existing structure, at the time of the initial remodeling, as <br /> determined by city of Everett valuation methods. All standards that do not involve <br /> repositioning the building or reconfiguring site development, as determined by the city, shall <br /> apply to major exterior remodels. <br /> B. Minor exterior remodels include all remodels within a three-year period with a value of fifty <br /> percent of the building valuation or less, as determined by the city of Everett valuation <br /> methods. For minor exterior remodels, only the proposed improvements shall meet the <br /> standards and/or guidelines of this chapter, and shall not create a greater nonconformance <br /> unless approved by the City, when it is infeasible for the remodel to comply with these <br /> standards. (For example, if a property owner decides to replace a building facade's siding, <br /> then the siding shall meet the applicable exterior building materials standards, but elements <br /> such as building modulation would not be required.) <br /> C. The standards and guidelines do not apply to remodels that do not change the exterior <br /> appearance of the building and site. However, if a project involves both exterior and interior <br /> improvements, then the project valuation shall include both exterior and interior <br /> improvements. <br /> 16 <br />