Laserfiche WebLink
i • • � ' � • • <br />2012 Washington State Energy Code Compliance rorms for Commercial Buildings including R2 & R3 over 3 stories and all R1 <br />ProjectAddress Everett e�ii Date 3/3/2015 <br />Applicability Code Location in Building <br />(yes,no,na) Section Component Compliance information required in permit documents Documents Department Notes <br />C402.3.1 Vertical fenestration Provide calculation for total vertical fenestration area as percentage of gross <br />maximum area above grade wall area <br />C402.3.12 Skylight maximum provide calculation for total skylight area as percentage of gross roof area <br />area <br />Indicate U-factors, SHGC and VT values in fenestration schedules; <br />C402.3.3 U-factors, SHGC --- - -- --- <br />and VT for all An area-weighted U-value may be used for all fenestration elements that <br />C402.3.1.3 fenestration qualify within the same fenestration category per Table C402.3; <br />C303.1.3 assemblies Indicate if values are NFRC or default. If default then specify frame type, <br />glazing layers, gap width, low-e coatings, gas-fill. <br />Increased max. Provide calculations showing that percentage of overall conditioned floor area <br />C402.3.1.1 in the daylight zone is equal to or greater than 50%; <br />Chap. 2 vertical fenestration <br />Definition area with daylighting Indicate method of daylighting control in lighting equipment schedules; <br />controls Indicate VT of vertical fenestration is at least 1.1 times the rated SHGC <br />Increased max. Indicate high pertormance U-factors and SHGC values in fenestration <br />C402.3.12 vertical fenestration schedules; _ <br />area with high- An area-weighted U-value may be used for all fenestration elements that <br />pertormance glazing qualify within the same fenestration category per this section <br />C402.3.3 Permanent shading Provide projection factor calculations (Equation C4-2) and associated SHGC <br />C402.3.3.1 devices multipliers for north and non-north orientations <br />Provide calculations for percentage of conditioned floor area located within a <br />skylight daylight zone; <br />Provide calculations for percentage of skylight area to daylight zone under <br />C402.3.2 Single story spaces skylights, OR; <br />requiring skylights provide calculations for percentage of overall skylight effective aperture <br />(Equation C4-1); <br />Indicate haze factor of skylight glazing material or diffuser <br />AIR LEAKAGE <br />Indicate location of continuous air barrier on plans and sections; <br />C402.4.1.� Air barrier - - - - <br />C402.42 construction and Provide details for all joints, transitions in materials, penetrations in air barrier <br />sealing and note method of sealing (caulked, gasketed, or other approved method) <br />Indicate locations of all stairway and shaft vents; <br />Stairway and shaft Provide leakage rating of motorized dampers in mechanical equipment <br />C402.4.5.1 schedules; <br />vents — - - <br />Indicate method of emergency operation - activation of fire alarm or <br />interruption of power <br />Indicate locations of all outside air intakes, exhausts and relief outlets, <br />Outdoor air intakes, including those integral to mechanical equipment; <br />C402.4.52 exhausts and relief - - - - <br />openings Provide in mechanical equipment schedules leakage rating of dampers, <br />identify whether motorized or gravity, and note any exceptions taken <br />C402.4.8 Recessed lighting in Indicate IC rating of fixtures in lighting equipment schedules; <br />building envelope Indicate method of sealin between li ht fixture housin and wall or ceilin <br />C402.4.6 Loadin dock seals Indicate weather seal at car o and loadin dock doors <br />Indicate locations and dimensions of vestibules; <br />C402.4.7 Vestibules For unconditioned vestibules, indicate which envelope assembly (interior or <br />exterior) complies with the requirements for a conditioned space <br />Indicate air barrier test method in accordance with ASTM E779 or approved <br />equivalent; <br />C402.4 - Air barrier building Include the following requirements in project documents: (1) air barrier test <br />1.2.3 test report shall be submitted to jurisdiction once test is completed; (2) if test <br />results exceed 0.4 cfm/ft2 at 0.3 in. wg then visually inspect air barrier and <br />seal noted sources of leakage; (3) submit a follow-up report to jurisdiction <br />noting corrective measures taken <br />If "no" is selected for anv question, provide explanation: <br />End of Building Permit Plans Checklist <br />